[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2019, Vol. 56 Issue (5) :133-142    DOI:
分析与计算 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
盾构隧道穿越桥梁桩基群的桩基托换技术研究
(西南交通大学交通隧道工程教育部重点试验室,成都 610031)
Research on Pile Foundation Underpinning Technology for the Shield Tunnel Passing through Bridge Pile Foundation Group
(Key Laboratory of Transportation Tunnel Engineering of Ministry of Education, Southwest Jiaotong University, Chengdu 610031)
Download: PDF (3704KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 为探析盾构隧道穿越桥梁桩基群中桩基托换过程的受力转换机理及盾构隧道掘进对群桩基础结构的影响,文章以深圳地铁10号线盾构隧道穿越广深高速桥梁桩基群为工程背景,采用FLAC3D开展桩基托换与地铁隧道施工的数值模拟。研究结果表明:桩基托换后,桥梁荷载体系从桥面板→桩基→地基土转换为桥面板→既有桩基+托换桩→地基土,被托换桩的上覆荷载能够有效地转移到新建托换桩上;在桩基托换与盾构掘进过程中所产生的沉降变形能够提高桩端阻力与桩侧摩阻力,使得桩基结构的最大主应力有所降低;桥梁桩基沉降量以盾构隧道推进过程中由地层损失和掘进扰动产生的沉降变形为主,桩基托换所产生的沉降量占总沉降量的20%~30%;桩基沉降变形、侧向位移与主应力降低效应均主要表现在托换桩上,非托换桩变化不大;盾构隧道管片衬砌结构变形主要产生在桩基托换区域附近,且以沉降变形为主,水平位移较小。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
陈子全 汪 波 吴 迪 杨 意
关键词:   
Abstract: In order to study the stress transfer mechanism of pile foundation during underpinning and the influence of tunnel excavation on pile foundation group, a numerical simulation of pile foundation underpinning and metro tunnel construction was conducted by FLAC3D based on the shield tunnel of Shenzhen metro line 10 passing through the bridge pile foundation of Guangzhou-Shenzhen motorway. The results show that the bridge load system changes from the order of bridge deck→pile foundation-soil to the order of bridge deck→existing pile foundation→underpinning pile→subsoil after underpinning of pile foundation, and the overlying load on underpinned pile is effectively transferred to the new pile; the settlement deformation induced by underpinning and excavation can increase the resistance at pile end and pile friction, so the maximum principal stress of pile foundation is reduced; the settlement of bridge pile foundation is mainly the deformation induced by ground loss and excavation disturbance in the process of shield tunnelling, and the proportion of settlement caused by underpinning of pile foundation is 20%-30% of total settlement; the reduction effects of settlement deformation, lateral displacement and principal stress of pile founda? tion occur at the underpinned pile while there is little change for the non-underpinned pile; deformation of lining structure of shield tunnel mostly occurs at the area near the underpinned area and it is mainly of settlement with small lateral deformation.
KeywordsShield tunnel,   Bridge pile foundation,   Underpinning of pile foundation,   Underpinned pile,   Force trans? fer mechanism,   Settlement deformation     
基金资助:基金项目:国家重点研发计划项目(2016YFC0802201).
作者简介: 作者简介:陈子全(1989-),男,博士研究生,主要从事隧道与地下工程方面的研究工作,E-mail:chen_ziquan@163.com. 通信作者:汪 波(1975-),男,工学博士,教授,主要从事隧道与地下工程方面的教学与研究工作,E-mail:ahbowang@163.com.
引用本文:   
陈子全 汪 波 吴 迪 杨 意 .盾构隧道穿越桥梁桩基群的桩基托换技术研究[J]  现代隧道技术, 2019,V56(5): 133-142
CHEN Ziquan WANG Bo WU Di YANG Yi .Research on Pile Foundation Underpinning Technology for the Shield Tunnel Passing through Bridge Pile Foundation Group[J]  MODERN TUNNELLING TECHNOLOGY, 2019,V56(5): 133-142
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2019/V56/I5/133
 
没有本文参考文献
[1] 范 磊.高地温深埋特长隧道热害综合防治关键技术研究[J]. 现代隧道技术, 2019,56(6): 1-10
[2] 高菊茹 1 张 博 1 王 耀 1 渠浩波 1 姚志军 2.高海拔特长公路隧道施工作业环境改善关键技术研究[J]. 现代隧道技术, 2019,56(6): 11-18
[3] 柳 献 1 李海涛 1 管攀峰 2 杨志豪 2.快速接头盾构隧道衬砌结构设计参数研究[J]. 现代隧道技术, 2019,56(6): 19-26
[4] 李 强 1 甘鹏路 2,3 钟小春 4.盾构隧道管片壁后注浆厚度对隧道抗浮影响研究[J]. 现代隧道技术, 2019,56(6): 27-35
[5] 李荣欣 1 陈骅伟 2 周松元 1 刘新平 1.含油气隧道瓦斯成因分析与安全治理[J]. 现代隧道技术, 2019,56(6): 36-40
[6] 唐 斌.成都地铁龙泉山隧道浅层天然气分布特征及运移规律研究[J]. 现代隧道技术, 2019,56(6): 41-46
[7] 秦 良 1 张庆朝 2.瞬变电磁法隧道超前地质预报物理模拟[J]. 现代隧道技术, 2019,56(6): 47-51
[8] 张民庆 黎 庶 刘俊成.横向内置加劲型中埋式橡胶止水带研制[J]. 现代隧道技术, 2019,56(6): 52-56
[9] 麻世垄 吴明颖 姚兆明.人工冻土蠕变试验及损伤经验模型分析[J]. 现代隧道技术, 2019,56(6): 57-62
[10] 马 莉 1 李 盛 2 王起才 2 于本田 2 刘亚朋 2 王庆石 2.高填黄土矩形、拱形明洞减载结构土压力差异性规律研究[J]. 现代隧道技术, 2019,56(6): 63-69
[11] 郭 健 1,2 杨治国 1,2 康逢学 3.基于向量投影响应面法的隧道围岩变形稳定可靠度分析[J]. 现代隧道技术, 2019,56(6): 70-77
[12] 刘明才.隧道超欠挖下锚喷支护系统的稳定性分析[J]. 现代隧道技术, 2019,56(6): 78-84
[13] 于建新 1 刘焕春 2 魏海霞 1 陈 晨 1.近邻隧道爆破施工相互动力影响研究[J]. 现代隧道技术, 2019,56(6): 85-92
[14] 谢立广 1 杨 群 2 盛 湧 1 唐富军 1.关于公路隧道健康状况均衡评估模型的探索[J]. 现代隧道技术, 2019,56(6): 93-98
[15] 孙浩轩 1 李培现 1 崔希民 1 姚德华 2 肖 武 3.巴岳山隧道受煤矿采动影响分析[J]. 现代隧道技术, 2019,56(6): 99-106
Copyright 2010 by 现代隧道技术