[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2019, Vol. 56 Issue (5) :187-194    DOI:
施工设备与材料 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
德格隧道冒顶和冒落破坏特征及处治技术
(1西南交通大学交通隧道工程教育部重点实验室,成都 610031; 2西南交通大学土木工程学院,成都610031; 3四川高速发展有限公司,成都 615000)
Characteristics of Roof Caving and Rock Falling of the Dege Tunnel and Corresponding Treatment Measures
(1 Key Laboratory of Transportation Tunnel Engineering of Ministry of Education, Southwest Jiaotong University, Chengdu 610031;2 Civil Engineering School, Southwest Jiaotong University, Chengdu 610031; 3 Sichuan Expressway Construction & Development Group Co., Ltd., Chengdu 615000)
Download: PDF (3457KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 在川藏公路德格隧道施工中相继出现冒顶和冒落事故。文章利用数值模拟和现场测试对围岩及支护的位移和应力特征进行研究,就同一隧道发生冒顶和冒落的破坏特征和机制进行了深入分析,最后提出了相应的处治措施。研究表明:冒顶破坏以碎屑流变为主,而冒落破坏以碎裂变形为主;冒顶发生时拱顶部碎石土出现塑形变形区,冒落发生时因围岩中形成的竖向与水平方向应力差产生扩容现象;浅埋碎石土围岩自稳能力差,施工扰动引起隧道冒顶破坏发生,而深埋绢云石英片岩裂隙发育,受围岩自重和施工爆破影响诱发隧道冒落破坏。基于以上结论,现场主要采用了限制塑性变形及碎裂变形扩展、施作锚注支护体系、实施“强行”联合支护和加强支护参数等关键措施。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
严 健 1
2 何 川 1 卢岱岳 1 雷德明 3
关键词:   
Abstract: Roof caving and rock falling occurred during the construction of Dege tunnel on the Sichuan-Tibet high? way. The characteristics of displacement and stress of surrounding rock and support were studied by numerical simulation and site test, a thorough analysis was carried out regarding the features and mechanism of roof caving and rock falling occurred at the same tunnel, and some corresponding treatment measures were proposed. The research results show that roof caving was represented by debris flow and rock falling was represented by cracked deformation; plastic zone of crushed stone occurs at tunnel crown in the course of roof caving and dilatancy occurs due to the difference of vertical stress and horizontal stress in the course of rock falling; roof caving is caused by construction disturbance due to poor self-stability of shallow-buried crushed rock mass and rock falling is induced by dead load of rock mass and blasting construction attributed to developed fissure of deep-buried sericite quartz schist. The main corresponding measures include restriction of plastic deformation and cracking development, installation of anchoring and injection support system, implementation of forced composite support and strengthening of the support parameters.
KeywordsSichuan-Tibet highway,   Tunnel engineering;Roof caving,   Rock falling,   Numerical simulation,   Field test;Failure characteristics,   Treatment measures     
基金资助:基金项目:国家自然科学基金(U1134208,U1361210);国家重点研发计划(2016YFC0802210-1-1);国家自然科学基金(51578456)
作者简介: 作者简介:严 健(1979-),男,博士,讲师,主要从事高海拔隧道工程技术研究工作,E-mail:sharefuture33@163.com.
引用本文:   
严 健 1, 2 何 川 1 卢岱岳 1 雷德明 3 .德格隧道冒顶和冒落破坏特征及处治技术[J]  现代隧道技术, 2019,V56(5): 187-194
YAN Jian1, 2 HE Chuan1 LU Daiyue1 LEI Deming2 .Characteristics of Roof Caving and Rock Falling of the Dege Tunnel and Corresponding Treatment Measures[J]  MODERN TUNNELLING TECHNOLOGY, 2019,V56(5): 187-194
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2019/V56/I5/187
 
没有本文参考文献
[1] 范 磊.高地温深埋特长隧道热害综合防治关键技术研究[J]. 现代隧道技术, 2019,56(6): 1-10
[2] 高菊茹 1 张 博 1 王 耀 1 渠浩波 1 姚志军 2.高海拔特长公路隧道施工作业环境改善关键技术研究[J]. 现代隧道技术, 2019,56(6): 11-18
[3] 柳 献 1 李海涛 1 管攀峰 2 杨志豪 2.快速接头盾构隧道衬砌结构设计参数研究[J]. 现代隧道技术, 2019,56(6): 19-26
[4] 李 强 1 甘鹏路 2,3 钟小春 4.盾构隧道管片壁后注浆厚度对隧道抗浮影响研究[J]. 现代隧道技术, 2019,56(6): 27-35
[5] 李荣欣 1 陈骅伟 2 周松元 1 刘新平 1.含油气隧道瓦斯成因分析与安全治理[J]. 现代隧道技术, 2019,56(6): 36-40
[6] 唐 斌.成都地铁龙泉山隧道浅层天然气分布特征及运移规律研究[J]. 现代隧道技术, 2019,56(6): 41-46
[7] 秦 良 1 张庆朝 2.瞬变电磁法隧道超前地质预报物理模拟[J]. 现代隧道技术, 2019,56(6): 47-51
[8] 张民庆 黎 庶 刘俊成.横向内置加劲型中埋式橡胶止水带研制[J]. 现代隧道技术, 2019,56(6): 52-56
[9] 麻世垄 吴明颖 姚兆明.人工冻土蠕变试验及损伤经验模型分析[J]. 现代隧道技术, 2019,56(6): 57-62
[10] 马 莉 1 李 盛 2 王起才 2 于本田 2 刘亚朋 2 王庆石 2.高填黄土矩形、拱形明洞减载结构土压力差异性规律研究[J]. 现代隧道技术, 2019,56(6): 63-69
[11] 郭 健 1,2 杨治国 1,2 康逢学 3.基于向量投影响应面法的隧道围岩变形稳定可靠度分析[J]. 现代隧道技术, 2019,56(6): 70-77
[12] 刘明才.隧道超欠挖下锚喷支护系统的稳定性分析[J]. 现代隧道技术, 2019,56(6): 78-84
[13] 于建新 1 刘焕春 2 魏海霞 1 陈 晨 1.近邻隧道爆破施工相互动力影响研究[J]. 现代隧道技术, 2019,56(6): 85-92
[14] 谢立广 1 杨 群 2 盛 湧 1 唐富军 1.关于公路隧道健康状况均衡评估模型的探索[J]. 现代隧道技术, 2019,56(6): 93-98
[15] 孙浩轩 1 李培现 1 崔希民 1 姚德华 2 肖 武 3.巴岳山隧道受煤矿采动影响分析[J]. 现代隧道技术, 2019,56(6): 99-106
Copyright 2010 by 现代隧道技术