沟槽式高填拱形明洞力学特性及其影响因素分析
(1兰州交通大学土木工程学院,兰州 730070 ;2 中国铁路北京局集团有限公司北京高铁工务段,北京 100071)
Analysis of Mechanical Properties and Influencing Factors of High-filled Cut-and-Cover Tunnel in Trench
(1 College of Civil Engineering, Lanzhou Jiaotong University, Lanzhou Gansu 730070; 2 Beijing High-speed Railway Works Maintenance Division of China Railway Beijing Group Co., Ltd., Beijing 100071)
Download: PDF (4139KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 针对高填土荷载作用下沟槽式拱形明洞结构受力研究较少问题,文章首先通过室内模型试验研究了沟槽式高填黄土拱形明洞受力特性,得到了明洞周围土压力分布形式以及拱圈外侧应力随填土高度的变化规律。结果显示,明洞顶曲线段土压力呈“中间大、两边小”分布特征。当填土较低(<1.2倍洞径高度)时,明洞竖向等效均布荷载大于规范值。而当填土较高(≥1.2倍洞径高度)时,明洞竖向等效均布荷载小于规范值。随着填土高度的增加,明洞两侧水平土压力由“正梯形”分布向“矩形”分布转变。明洞底土压力呈“均布荷载”分布。随着填土高度的增加,拱肩截面外侧应力变化较小,而拱顶、侧墙及拱底截面外侧应力显著增加;然后对试验过程进行数值模拟分析。结果显示,明洞周围土压力平均相对误差为11.3%,外侧应力平均相对误差为14.5%,可验证试验数据的正确性及计算参数的合理性;最后进一步探讨了填土高度、沟槽边坡坡角、填料性质和沟槽与明洞宽度比等参数的敏感性对明洞衬砌结构内力的影响。结果表明,沟槽边坡坡角、沟槽与明洞宽度比影响最大,实际工程中应尽量提高边坡坡角,降低沟槽与明洞宽度比,以期改善明洞结构受力。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
马 莉 1 王起才 1 李 盛 1 刘亚朋 2 宁贵霞 1 韩国强 1
关键词:   
Abstract: As for few studies on the stress state of the arched open cut tunnel under high backfilling, the mechani? cal characteristics of high-filled open cut tunnels with arched cross-section in the cutting trench is studied through laboratory tests, the earth pressure distributions around open cut tunnel and stress variations outside tunnel arch ring along with backfilling height are obtained. The results show that the earth pressure distribution at the arched section on the top of open cut tunnel is in the shape of being large in the middle and small on both sides. When the backfilling height is low (less than 1.2 times of the tunnel height), the equivalent vertical uniform load is greater than the value specified in specifications, while being less than this value specified in specifications when the backfilling is high (equal to or greater than 1.2 times of the tunnel height). With the increase of backfilling height, the distribution pattern of earth pressure on both sides of open cut tunnel changes from "positive trapezoid" to "rectangular", and the earth pressure on bottom of open cut tunnel is uniformly distributed. With the increase of backfilling height, the external stress of the section at the spandrel varies little, but increases obviously at the vault, side wall and the bottom of the open cut tunnel. Subsequent numerical simulation analysis shows that the average relative error of earth pressure around open cut tunnel is 11.3%, and the average relative error of external stress is 14.5%, verifying the correctness of experimental data and the rationality of the numerical simulation parameters. Finally, the effects on the internal force of lining structure induced by sensitivity of the influential factors are discussed, such as the backfilling height, slope angle, backfill properties and the trench-width ratio. The results show that the slope angle and trench-width ratio have the most significant effect on the internal force of lining structure. To improve the me? chanical properties of the open cut tunnel in the practical engineering, the slope angle should be increased, and the trench-width ratio should be reduced as much as possible.
KeywordsLoess,   High-filled open cut tunnels,   Trench,   Mechanical characteristics,   Influencing factor,   Internal forces     
基金资助:基金项目:国家自然科学基金项目(51668036,51868041);长江学者和创新团队发展计划项目(IRT_15R29)
作者简介: 作者简介:马 莉(1982-),女,在读博士研究生,讲师,主要从事桥梁与隧道方面的教学与研究工作,E-mail: 451906654@qq.com. 通讯作者:王起才(1962-),男,博士,教授,主要从事桥梁与隧道工程方面的研究工作,E-mail:13909486262@139.com
引用本文:   
马 莉 1 王起才 1 李 盛 1 刘亚朋 2 宁贵霞 1 韩国强 1 .沟槽式高填拱形明洞力学特性及其影响因素分析[J]  现代隧道技术, 2020,V57(6): 133-141
MA Li1 WANG Qicai1 LI Sheng1 LIU Yapeng2 NING Guixia1 HAN Guoqiang1 .Analysis of Mechanical Properties and Influencing Factors of High-filled Cut-and-Cover Tunnel in Trench[J]  MODERN TUNNELLING TECHNOLOGY, 2020,V57(6): 133-141
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2020/V57/I6/133
 
没有本文参考文献
[1] 范 磊 杨昌宇.特长铁路隧道超深竖井模式下防灾疏散及救援技术研究[J]. 现代隧道技术, 2020,57(6): 1-7
[2] 刘建友 1 赵 勇 2 吕 刚 1 刘淑芬 3 刘春晓 1.隧道下穿高速铁路路基风险分级及风险评价方法研究[J]. 现代隧道技术, 2020,57(6): 8-16
[3] 常银生 1,2 吕 乐 1 王敬敬 1,3 王旭东 1.考虑基础埋深的隧道开挖对邻近建筑物损坏程度评价[J]. 现代隧道技术, 2020,57(6): 17-24
[4] 刘星宏 1 林达明 2 俞 缙 3 丘仁科 4 苏兴炬 4 楼重华 5 王 辉 6 张中俭 1.BIM技术在国内隧道工程中的应用[J]. 现代隧道技术, 2020,57(6): 25-35
[5] 蔡清程.盾构隧道管片预制智能化控制技术[J]. 现代隧道技术, 2020,57(6): 36-45
[6] 魏英华 柳 飞.高地应力隧道岩爆机理数值模拟分析[J]. 现代隧道技术, 2020,57(6): 46-54
[7] 蒋武军 1 李得建 2,3 瞿拓宇 3.基于强度折减法的浅埋隧道掌子面三维主动稳定性上限解析[J]. 现代隧道技术, 2020,57(6): 55-62
[8] 徐 鹏 1 黄 俊 1 周剑波 1 唐劲舟 2.护盾式TBM穿越断层破碎带岩机相互作用三维数值模拟研究[J]. 现代隧道技术, 2020,57(6): 63-69
[9] 张 权 1 姜谙男 1 吴洪涛 2 段龙梅 2.基于遍布节理模型的隧道循环开挖进尺优化研究[J]. 现代隧道技术, 2020,57(6): 70-77
[10] 杨 涛.富水圆砾地层盾构隧道端头加固优化设计研究[J]. 现代隧道技术, 2020,57(6): 78-85
[11] 郑邦友 1 刘济遥 2,3 雷明锋 2,3 卢智强 1 吴治刚 1 彭 成 1.隧道漏水诱发的地层水位降深计算方法与工程应用[J]. 现代隧道技术, 2020,57(6): 86-92
[12] 张嘉文 1,2,3 雷卫东 1 贺少辉 3.运营热力隧道衬砌结构可靠度分析及剩余寿命预测研究[J]. 现代隧道技术, 2020,57(6): 93-100
[13] 吴招锋 1 胡辉荣 2.隧道衬砌结构在火灾高温下的变形及力学行为研究[J]. 现代隧道技术, 2020,57(6): 101-106
[14] 朱 磊 1 杨 燕 2 饶 辉 1 牛澎波 2.地铁隧道整体道床不同程度离缝对轨道结构动态响应影响分析[J]. 现代隧道技术, 2020,57(6): 107-114
[15] 罗 丹.某复合盾构刀盘有限元分析及参数优化[J]. 现代隧道技术, 2020,57(6): 115-119
Copyright 2010 by 现代隧道技术