现代隧道技术 2024, Vol. 61 Issue (3) :266-275    DOI:
规划设计与施工 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
密集城区超大直径盾构切削群桩对上部建筑物振动影响规律分析
(1.深圳大学土木与交通工程学院,深圳 518060;2.中铁十四局集团大盾构工程有限公司,南京 211800; 3.滨海城市韧性基础设施教育部重点实验室(深圳大学),深圳 518060; 4.深圳市地铁地下车站绿色高效智能建造重点实验室,深圳 518060)
Analysis on the Vibration Influence on Upper Buildings Induced by Cutting of Pile Group by Extra-large-diameter Shield in Dense Urban Areas
(1. College of Civil and Transportation Engineering, Shenzhen University, Shenzhen 518060; 2. China Railway 14th Bureau Group Mega Shield Construction Engineering Co., Ltd., Nanjing 211800; 3. Key Laboratory of Coastal Urban Resilient Infrastructures (Shen?zhen University), Ministry of Education, Shenzhen 518060; 4. Key Laboratory of Green, Efficient and Intelligent Construction of Metro Underground Stations in Shenzhen, Shenzhen 518060)
Download: PDF (9423KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 在城市中心区域修建盾构隧道时,遭遇既有建(构)筑物桩基础不可避免,然而直接切削桩基面临巨大风险。为了进一步揭示盾构直接切削桩基内在机理,以广州海珠湾隧道下穿中核商务大厦工程为例,根据现场实测振动数据,分析盾构磨桩诱发中核商务大厦振动响应的规律,并研究盾构磨桩过程中建筑物的倾斜程度。研究结果表明:盾构磨桩掘进时,建筑物以竖直振动为主;在建筑物内部,振动随传播距离的增长而迅速衰减,因此盾构施工振动的影响范围较小,以隧道中线为轴线约2D/3(D为盾构直径)的区域是重点影响范围,并且监测结果显示距离盾构隧道最近的第一层振动突变幅度为第二层突变幅度的2倍以上;振动幅度反映了建筑物的倾斜方向,可通过监测建筑物的振动变化来分析建筑物的倾斜方向。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
关键词超大直径盾构   盾构施工   切削桩基   建筑物振动   现场监测     
Abstract: Construction of a shield tunnel in a central urban area will inevitably encounter the pile foundations of existing buildings or structures, but direct cutting of the pile foundation will impose enormous risks. In order to further reveal the internal mechanism of cutting of pile foundation by a shield, the case of the Haizhu Bay Tunnel cutting through the foundation of CNNC Business Building is used as an example in this study. The field measured vibration data is used to analyze the pattern of the vibration response of CNNC Business Building induced by the shield grinding the pile foundation, and to investigate the tilt of the building caused by the shield grinding the pile foundation. As the study results indicate: The building mainly experiences vertical vibration when the shield grinds the pile foundation. Inside the building, the vibration is quickly attenuated as its propagation distance increases, so the vibration induced by shield construction impacts only a small area. The area in 2/3D (D is the shield diameter) with the tunnel center line being the axis is the key impact area. As indicated by the monitoring results, the vibration catastrophe amplitude of the first floor, which is closest to the shield tunnel, is over 2 times the vibration catastrophe amplitude of the second floor. According to the study, the vibration amplitude will indicate the direction of tilt of the building, so the direction of tilt of the building can be analyzed by monitoring its vibration variation.
KeywordsExtra-large-diameter shield,   Shield construction,   Cutting of pile foundation,   Building vibration,   Field monitoring     
基金资助:广东省自然科学基金(2023A1515010060);国家自然科学基金(52378404, 52108377).
作者简介: 陈一凡(2000-),男,硕士研究生,主要从事盾构隧道研究工作,E-mail:2200471048@email.szu.edu.cn. 通讯作者:沈 翔(1991-),男,博士研究生,助理教授,主要从事盾构隧道施工安全智能控制方面的研究工作,E-mail:shenxiang@szu.edu.cn.
引用本文:   
.密集城区超大直径盾构切削群桩对上部建筑物振动影响规律分析[J]  现代隧道技术, 2024,V61(3): 266-275
.Analysis on the Vibration Influence on Upper Buildings Induced by Cutting of Pile Group by Extra-large-diameter Shield in Dense Urban Areas[J]  MODERN TUNNELLING TECHNOLOGY, 2024,V61(3): 266-275
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2024/V61/I3/266
 
没有本文参考文献
[1] 陈友建.基于数字化地质模型的盾构隧道可视化仿真预警体系研究与应用[J]. 现代隧道技术, 2024,61(3): 166-174
[2] 浣宇翔1 田礼勇2 杨文波1 李昊豫1 刘 勇3 唐 浩3 姚超凡1.软岩大变形隧道支护拆换力学与时空变形行为研究[J]. 现代隧道技术, 2024,61(3): 96-107
[3] 郑镇跡1 黄书华2 陈湘生1 张 良2 刘皓铭1 盛 健2 苏 栋1.超大直径盾构主隧道机械法联络通道特殊衬砌管片受力特性分析[J]. 现代隧道技术, 2024,61(1): 117-124
[4] 魏传文1 王相龙1 杨旭旭2 赵玉棣1 邵 行3 满新杰1张长安3 周洋洋1 张作顺2.薄层状岩体隧道冒顶机制及支护方案优化研究[J]. 现代隧道技术, 2024,61(1): 252-259
[5] 田宝华 1 赵永明 1 吴行州 1 张 彪 1,2 高 嵩 1.杉阳隧道软岩大变形控制方法及结构力学特性研究[J]. 现代隧道技术, 2023,60(3): 242-251
[6] 燕 波 1 张俊儒 2 张新锦 1 彭 磊 1 宁 波 1.基于围岩径向位移释放率的超大断面隧道下穿施工围岩稳定性研究[J]. 现代隧道技术, 2023,60(2): 115-124
[7] 王烨晟 1,2 吴 勇 1,2 赵良云 3 李 伟 3 姜宜杰 4 赵 焕 4 丁 智 5,6.城市地下工程盾构施工风险分级管控平台研发与应用分析[J]. 现代隧道技术, 2023,60(1): 76-89
[8] 胡 珉 1,2 胡星辰 1,2 宋 云 3 羌 培 3.基于知识图谱的盾构施工辅助决策系统设计和开发[J]. 现代隧道技术, 2023,60(1): 66-75
[9] 刘 智 1 钟长平 2.超大直径泥水平衡盾构断层破碎带掘进关键技术研究[J]. 现代隧道技术, 2023,60(1): 225-232
[10] 黄 辉 汤勇茂 曹赛赛.富水砂层土压盾构螺旋输送机喷涌处治技术[J]. 现代隧道技术, 2022,59(4): 234-239
[11] 隗志远 1 冯冀蒙 2 虞龙平 2.地铁车站双层初期支护拱盖法施工过程力学行为研究[J]. 现代隧道技术, 2022,59(3): 265-274
[12] 王怀正 1 宋战平 1,2 张学文 3 田小旭 1,2 潘红伟 4.富水弱胶结地层大断面隧道施工方案优化与工程应用研究[J]. 现代隧道技术, 2022,59(2): 210-219
[13] 周稳弟 1,2 梁庆国 1,2 张晋东 3.某地铁车站洞桩法施工变形和结构受力分析[J]. 现代隧道技术, 2021,58(6): 121-128
[14] 高鹏鹏 1 徐 方 1 宋普涛 2 王宁宁 3 张 伟 4.高性能同步注浆材料对富水砂层盾构施工参数的影响研究[J]. 现代隧道技术, 2021,58(6): 244-250
[15] 章龙管 1 刘绥美 1 李开富 1 徐 进 2,3,4 王胜楠 3,5 李 强 3.基于故障树与贝叶斯网络的地铁盾构施工风险预测[J]. 现代隧道技术, 2021,58(5): 21-29