现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
现代隧道技术
·Online Submission
·Manuscript Tracking
·Peer Review
·Editor Work
·Office Work
·Editor-in-chief
 Journal Online
·Forthcoming Articles
·Current Issue
·Next Issue
·Archive
·Advanced Search
·Read Articles
·Download Articles
·Email Alert
·
 Download
·
More>>  
 
Top Read Articles
Published in last 1 year |  In last 2 years |  In last 3 years |  All

1 [The Rapid Driving Techniques of a Shield Machine under a Section with Shallow Overburden - URUP Method] 2012 Vol.49(6):43-48
SUI Tao [Abstract] ( 8310 ) [HTML 0 KB][PDF 0 KB] (735)
2 [Design and Application of Forced Centering Connecting Apparatus for a YJTQ-1 Gyrotheodolite] 2013 Vol.50(1):171-176
[Abstract] ( 6551 ) [HTML 0 KB][PDF 0 KB] (819)
3 [Control Points of Construction Sequences for Tunnels on High-Speed Railways] 2012 Vol.49(4):51-55
CUI Wen-Qiang [Abstract] ( 6370 ) [HTML 0 KB][PDF 0 KB] (733)
4 [Study of Shield Construction Technology in Soft Upper Stratum and Hard Under Stratum] 2012 Vol.49(2):54-58
DENG Bin-1, GU Xiao-Fang-2 [Abstract] ( 6199 ) [HTML 0 KB][PDF 0 KB] (715)
5 [Alternated Construction Technique Applied to a Shield-Driven Tunnel in a Water-Abundant Sandy Pebble Stratum] 2011 Vol.48(6):150-154
WANG Zhang-Ya [Abstract] ( 5898 ) [HTML 0 KB][PDF 0 KB] (510)
6 [Study of Key Techniques for a Shield Machine Passing Through a Mined Tunnel] 2012 Vol.49(2):59-64
DENG Bin-1, GU Xiao-Fang-2 [Abstract] ( 5194 ) [HTML 0 KB][PDF 0 KB] (654)
7 [A Study of the Layout of Jet Fans in Railway Tunnels] 2013 Vol.50(5):140-145
Chao Zhengmao Yang Qixin Guo Chun [Abstract] ( 5151 ) [HTML 0 KB][PDF 0 KB] (642)
8 [Discussion of Municipal Enterprises Involved in Shield Metro Construction] 2012 Vol.49(2):1-6
LIU Sheng-Xiang [Abstract] ( 5028 ) [HTML 0 KB][PDF 0 KB] (727)
9 [Study of the Longitudinal Uneven Deformation and Stress State of the Shield Tunnel Crossing the Yangtze River] 2012 Vol.49(3):87-93
WANG Jin-Long [Abstract] ( 5019 ) [HTML 0 KB][PDF 0 KB] (571)
10 [Discussion on EPB Shield Tunneling in Liquifying Stratum] 2011 Vol.48(3):123-127
CAO Zheng-Xi [Abstract] ( 5014 ) [HTML 0 KB][PDF 0 KB] (612)
11 [Technique Problems Need to be Solved Urgently in Current Railway Tunnel Construction] 2011 Vol.48(5):1-6
MA Hui-12, , Liu-Ren-Zhi-2, Chen-Shou-Gen-1, Gao-Ming-Zhong-3 [Abstract] ( 4931 ) [HTML 0 KB][PDF 0 KB] (788)
12 [Demonstration of a Plain Concrete Secondary Lining for a Double-Track Railway Tunnel Section in Deep-Buried Surrounding Rock of Grade IV] 2012 Vol.49(4):76-82
LI Ding-Yue, XIAO Kai-Gang, ZHOU Guo-Hui, WU Zhi-Gang [Abstract] ( 4665 ) [HTML 0 KB][PDF 0 KB] (724)
13 [Electrical Components and Troubleshooting of an NFM Shield Machine] 2012 Vol.49(2):82-85
ZHUANG Qing-Hua [Abstract] ( 4633 ) [HTML 0 KB][PDF 0 KB] (726)
14 [Treatment Scheme for Hard Rock Encountered by the Shield-Driven Tunnel in Mix Strata] 2012 Vol.49(4):184-191
LIAO Hong-Yan [Abstract] ( 4624 ) [HTML 0 KB][PDF 0 KB] (693)
15 [Construction Cost Analysis and Risk Management of the Shenzhen Metro Lot 2222] 2012 Vol.49(2):34-41
LUO Zhong, HU Zheng-Dong [Abstract] ( 4608 ) [HTML 0 KB][PDF 0 KB] (728)
16 [Analysis on Deep Hole Grouting Consolidation for Tunnels in Water-rich Sandy Gravel Stratum] 2011 Vol.48(3):132-135
SONG Xiu-Yuan [Abstract] ( 4585 ) [HTML 0 KB][PDF 0 KB] (647)
17 [Study of Controllable Grouting Techniques for Water-Rich Karst Tunnels] 2012 Vol.49(6):172-175
GAO Dong-Bo, ZHOU Kai [Abstract] ( 4481 ) [HTML 0 KB][PDF 0 KB] (711)
18 [Application of Boom-type Roadheader in a Metro Tunnel with Complex Cross-sections] 2011 Vol.48(4):32-38
QI Tai-Yue, LI Bin [Abstract] ( 4476 ) [HTML 0 KB][PDF 0 KB] (774)
19 [Construction of Majiapo Tunnel] 2012 Vol.49(4):147-151
LI Gang, ZHAO Long-Tao [Abstract] ( 4459 ) [HTML 0 KB][PDF 0 KB] (688)
20 [Analysis and Control of the Construction Progress of Lot 2222 of the Shenzhen Metro Line 2] 2012 Vol.49(2):28-33
LIU Sheng-Xiang-1, LUO Zhong-2 [Abstract] ( 4444 ) [HTML 0 KB][PDF 0 KB] (686)
21 [Hydrogen Sulphide Monitoring and Comprehensive Treatment Programme for the Huayingshan Highway Tunnel] 2011 Vol.48(4):25-31
TANG Xie, Chen-Gui-Hong, Zhou-Ren-Qiang [Abstract] ( 4441 ) [HTML 0 KB][PDF 0 KB] (747)
22 [Construction Ventilation Scheme for the Huayingshan Extra-Long
Tunnel on the Nanchong-Dazhu-Liangping Expressway]
2013 Vol.50(4):188-196
Wang Xiaomin1,2 Fang Yong2 [Abstract] ( 4441 ) [HTML 0 KB][PDF 0 KB] (560)
23 [Study on Freezing Method Applied for Large Diameter River-crossing
Shield Tunnel in Nanjing City]
2011 Vol.48(3):80-86
WEI Long-Hai, Guo-Xiao-Hong, Qiao-Chun-Jiang, Shi-Shi-Bo [Abstract] ( 4355 ) [HTML 0 KB][PDF 0 KB] (640)
24 [Strategy for Illumination Energy-saving of Highway Tunnels
under the Condition of "Low-carbon Economy"]
2011 Vol.48(3):14-21
TU Yun, WANG Shao-Fei- Zhang-Qi, DENG Xin, CHEN Jian-Zhong, LI Ke, ZHAO Qing-Bi, WU Xiao-Li- [Abstract] ( 4273 ) [HTML 0 KB][PDF 0 KB] (750)
25 [Application of Curtain Grouting to F9 Fault of Qingyunshan Tunnel on Xiangtiang-Putian Railway] 2011 Vol.48(3):140-143
JIN Tuan-Hui [Abstract] ( 4246 ) [HTML 0 KB][PDF 0 KB] (715)
26 [Study on Entrance Excavation of a Tunnel in Shallow SoftFractured Surrounding Rock] 2011 Vol.48(3):117-122
JIANG Tong-Hu-1, Huo-San-Sheng-2, Ye-Fei-1, Xia-Yong-Xu-1 [Abstract] ( 4209 ) [HTML 0 KB][PDF 0 KB] (684)
27 [Water and Mud Outburst Treatment for F3 Fault of the Jiubao Tunnel on the Zhangjiako-Jining Railway] 2011 Vol.48(4):1-5
ZHANG Mei-1, Xiao-Guang-Zhi-1, Zhao-Xi-Min-2, Sun-Guo-Qing-3 [Abstract] ( 4172 ) [HTML 0 KB][PDF 0 KB] (842)
28 [Study of Tunnel Clearance Area and Inner Perimeter of Magnetic Levitation Railways] 2011 Vol.48(4):39-43
LIU Chao-Qun-1, PENG Hong-Jun-2 [Abstract] ( 4123 ) [HTML 0 KB][PDF 0 KB] (829)
29 [Construction Techniques for Deep Tunnels Passing through
Large Karst Cavity with Rich Water
——Energy Releasing & Pressure Reduction Techniques and Safety Construction of Yeshanguan Tunnel Passing through "602" Karst Cavity on Yichang-Wanzhou Railway]
2011 Vol.48(3):1-6
ZHANG Mei [Abstract] ( 4103 ) [HTML 0 KB][PDF 0 KB] (951)
30 [Durability Design for Structure of Beigushan Tunnel in Lianyungang] 2011 Vol.48(3):112-116
XIE Zun-Xian-1, Zhu-Yong-Quan-2, Chen-Shao-Hua-3, Lai-Di-Quan-4, Zhao-Dong-1, Han-Xian-Min-2 [Abstract] ( 4013 ) [HTML 0 KB][PDF 0 KB] (740)
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn