注浆止水技术在高水压强渗透地层盾尾刷更换施工中的应用
(1中交第二航务工程局有限公司,武汉 430040;2中交第二航务工程局有限公司工程装备分公司,武汉 430014;3中交第二航务工程局有限公司技术中心,武汉 430040 )
Application of Grouting and Water-Blocking Techniques to the Replacement of Shield Tail Seal Brushes in a Permeable Strata with High Water Pressure
(1 CCCC Second Harbour Engineering Co. Ltd., Wuhan 430040; 2 Engineering Equipment Branch of CCCC Second Harbour Engineering Co. Ltd., Wuhan 430014; 3 National Enterprise Technology Center, CCCC Second Harbour Engineering Co. Ltd., Wuhan 430040)
Download: PDF (765KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 盾尾密封的完整性和可靠性对于盾构施工安全极其重要。当盾尾刷出现损坏时,要及时进行更换,而进行盾尾刷更换的关键在于地层中地下水的封堵。文章以南京纬三路过江通道N线工程为例,结合高水压强渗透地层盾尾刷更换施工的特点和要求,采用了改进的注浆止水技术。一是通过加强同步注浆,形成第一道止水体系;二是采用增设预留孔的两环特殊管片,对盾尾区域进行止水加固;三是在盾构B环注入聚氨酯形成止水带,防止前方泥水舱泥水后窜。通过采取多道措施形成一个厚度大、密实性高、且具有一定强度的完整止水体系,在无水的环境中成功更换了盾尾刷。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
关键词:   
Abstract: The integrity and reliability of shield-tail sealing are very important to the safety of shield tunnelling, and tail-seal brushes need to be replaced quickly in case of any damage; therefore the sealing of underground water is key to success in these cases. Taking line N of the Nanjing Weisan Road river-crossing project as an example, and considering the characteristics and requirements of replacing a tail-seal brush in a strong, permeable strata with high water pressure, an improved grouting technique was adopted for stopping water: 1) the primary water-stopping system was formed by strengthening the synchronous grouting; 2) the shield-tail part was consolidated by grouting via two special segments with additional reserved holes; and 3) the B-ring of the shield was grouted with polyurethane to avoid leakage from the front of the slurry chamber. Using this method, a complete water-sealing system characterized by its thickness, high density and strength is formed, ensuring successful replacement of the tail-seal brushes in a dry environent.
KeywordsShield,   High water pressure,   Strong permeable strata,   Grouting,   Replacement of tail-seal brush     
基金资助:

基金项目:江苏省交通厅科技项目(2011Y22).

作者简介: 作者简介:施瑾伟(1969-),男,硕士,高级工程师,主要从事施工项目管理工作,E-mail:596518407@qq.com.
引用本文:   
.注浆止水技术在高水压强渗透地层盾尾刷更换施工中的应用[J]  现代隧道技术, 2015,V52(4): 190-194
.Application of Grouting and Water-Blocking Techniques to the Replacement of Shield Tail Seal Brushes in a Permeable Strata with High Water Pressure[J]  MODERN TUNNELLING TECHNOLOGY, 2015,V52(4): 190-194
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2015/V52/I4/190
 
没有本文参考文献
[1] 刘飞香 1,2.SCDZ133智能型隧道多功能作业台车及其施工技术[J]. 现代隧道技术, 2019,56(4): 1-7
[2] 周文波 吴惠明 赵 峻.泥岩地层常压刀盘盾构的掘进策略与分析[J]. 现代隧道技术, 2019,56(4): 8-15
[3] 陈卓立 1,2 朱训国 1,2 赵德深 1,2 王云平 1,2.深埋隧洞让压支护结构的锚固机理探究[J]. 现代隧道技术, 2019,56(4): 16-22
[4] 王全胜.矩形盾构法隧道管片分块案例分析及分块原则[J]. 现代隧道技术, 2019,56(4): 23-29
[5] 张 恒 1 朱亦墨 1 林 放 1 陈寿根 1 杨家松 2.基于Q系统的地下洞库中台阶最佳开挖高度研究[J]. 现代隧道技术, 2019,56(4): 30-37
[6] 李 好.大断面岩溶隧道贯通段地质情况的无线电波透视试验探测[J]. 现代隧道技术, 2019,56(4): 38-42
[7] 岑培山 1 田坤云 2 王喜民 3.蒙华铁路阳山隧道瓦斯危害性评估研究[J]. 现代隧道技术, 2019,56(4): 43-49
[8] 朱建峰 1 宫全美 2.软土地层盾构隧道长期沉降离心试验研究[J]. 现代隧道技术, 2019,56(4): 49-55
[9] 陈柚州 1 任 涛 2 邓 朋 2 王 斌 3.基于人工蜂群优化小波神经网络的隧道沉降预测[J]. 现代隧道技术, 2019,56(4): 56-61
[10] 王登茂 滕振楠 田志宇 陈志学.桃园至巴中高速公路八庙隧道非常规岩爆段病害处治与设计反思[J]. 现代隧道技术, 2019,56(4): 62-68
[11] 吴树元 1 程 勇 1 谢全敏 2 刘继国 1 陈必光 1.西藏米拉山隧道围岩大变形成因分析[J]. 现代隧道技术, 2019,56(4): 69-73
[12] 王 睢 1,2,3 钟祖良 3 刘新荣 3 吴 波 1,2,4 赵勇博 1,2 李占涛 1,2.基于D-P准则有压圆形衬砌隧洞弹塑性解[J]. 现代隧道技术, 2019,56(4): 74-80
[13] 李 明 严松宏 潘春阳 张旭斌.富水大断面黄土隧道开挖流固耦合效应分析[J]. 现代隧道技术, 2019,56(4): 81-88
[14] 张 凯 1 陈寿根 2 霍晓龙 3 谭信荣 4.岩溶地区隧道涌水风险的可拓评价模型及应用[J]. 现代隧道技术, 2019,56(4): 89-96
[15] 李 杰 1 张 斌 1 付 柯 1 马 超 1 郭京波 1 牛得草 2.基于现场掘进数据的复合地层盾构掘进性能预测方法研究[J]. 现代隧道技术, 2019,56(4): 97-104
Copyright 2010 by 现代隧道技术