高速铁路大断面黄土隧道台阶法修建技术

Construction Techniques for Large-Section Loess Tunnels of High-Speed Railways by Bench Method

  • 摘要: 文章依托郑西、 宝兰高速铁路建设, 对大断面黄土隧道工法适用性进行试验研究, 以探明台阶法围岩及支护系统的变形和受力特性, 为解决大断面黄土隧道施工关键技术提供依据。研究结果表明: 大断面黄土隧道可采用台阶法相对快速施工;黄土的含水量为影响支护结构变形和稳定性的关键因素。文章最后提出了按不同含水量确定大断面黄土隧道施工方法的技术体系。

     

    Abstract: Based on the construction of the Zhengzhou-Xi′an and Baoji-Lanzhou high-speed railways, an experimental study on the practicability of construction methods for large-section loess tunnels was conducted to deter? mine the deformation and stress characteristics of the surrounding rock and bench method supporting system and provide a basis for key construction techniques of large-section loess tunnels. Study results show that the construction of large-section loess tunnels by the bench method is relatively rapid, and the water content in loess is a key influential factor for the deformation and stability of the supporting structure. A technical system is proposed to determine the construction method of large-section loess tunnels by considering different loess water contents.

     

/

返回文章
返回