隔板与风管联合通风技术在特长高原隧道施工中的应用

Application of Combined Clapboard and Vent-Pipe Ventilation Techniques in the Construction of Extra-Long Tunnels on a Plateau

  • 摘要: 长距离隧道钻爆法施工中的施工通风问题一直是隧道技术人员面临的难题, 尤其在高原缺氧地区该问题更加突出。西格二线关角特长隧道长约 32.6 km, 具有海拔高、 距离长、 工作面多和施工通风困难等特点。为了解决关角隧道长距离施工通风难题, 首次提出了分隔斜井与正洞风管联合通风方案, 进行了隧道通风系统设计与风机的选型, 并对通风效果进行了数值模拟及现场实测, 得出了联合通风方案下多工作面施工时风管出口到工作面的合理距离及工作面风速与风管口到工作面距离的关系;实测有害气体 (CO、 SO2) 含量与工作面施工状况有很大关系,一般工况下可满足现行隧道规范要求, 通风效果良好。该通风技术为长距离隧道施工通风设计提供了新的思路。

     

    Abstract: Ventilation is always a challenge that tunnel technicians have to face in the construction of long-dis? tance tunnels by the drill-blasting method, especially in the hypoxic plateau. The 32.6 km-long Guanjiao tunnel is characterized by its high altitude, long distance, multiple working faces and ventilation difficulties; therefore, a combined separated inclined shaft and vent-pipe ventilation system is put forward for the first time to solve the tunnel′s ventilation problem during construction. After the selection of a fan and the design of the tunnel ventilation system,a numerical simulation and field measurements were carried out to test the ventilation effects and obtain a reasonable distance from the nozzle of the air pipe to the working face and its relationship to the air speed on the working face when the working face is under construction by the combined ventilation scheme. The measurements show that the poisonous gases (CO, SO2) have a lot to do with the construction situation of the working face, and the ventilation effect is good and meets the current requirements of tunnel specifications for general working conditions.

     

/

返回文章
返回