[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2017, Vol. 54 Issue (2) :26-33    DOI:
研究与探讨 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
片岩隧道群衬砌开裂特征与机理分析
(1 河北大学建筑工程学院, 保定 071002; 2 甘肃省中建市政工程勘察设计研究院, 兰州 730030;3中国地质调查局水文地质环境地质调查中心, 保定 071051)
Analysis of the Characteristics and Mechanism of Lining Cracking for a Tunnel Group in Schist
(1 School of Architecture and Engineering, Hebei University, Baoding 071002; 2 Gansu CSCEC Municipal Engineering Investigation and Design Institute, Lanzhou 730030; 3 Center for Hydrogeology and Environmental Geology, China Geological Survey, Baoding 071051)
Download: PDF (4534KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 在对湖北省谷竹高速公路隧道二次衬砌完整性的调查过程中, 发现片岩隧道普遍存在二次衬砌开裂现象。为了合理科学地治理开裂问题, 文章通过对沿线 48座隧道的调查分析, 归纳和总结出该区段隧道二次衬砌开裂的 6大特征: 片岩隧道二次衬砌开裂现象普遍; 开裂位置主要位于进、 出口浅埋段; 先行洞裂缝数量多于后行洞, 开裂形式主要为斜向开裂; 在发生大变形、 塌方等地段二次衬砌容易开裂; 开裂的时间一般在二次衬砌施作 5个月后。在此基础上, 通过室内试验与现场调查共同分析二次衬砌开裂的成因机理, 并得出原因: 片岩的强度低, 遇水易软化; 洞口处的浅埋段成拱性差; 偏压现象普遍; 仰拱不均匀沉降; 岩石受地下水的影响及岩体的蠕变效应。最后, 根据开裂原因提出相应的增加围岩级别、 加强洞口施工及重视小净距中夹岩稳定设计等建议措施, 为类似工程提供相关参考依据。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
关键词:   
Abstract: Cracking in the secondary lining of tunnels in schist was found to be common when a survey of second? ary lining integrity was conducted for the tunnels of the Gucheng-Zhuxi expressway in Hubei province. To scientifically solve the problem of cracking, the following characteristics were summarized based on an investigation of the 48 tunnels along this line: 1) it is very common to see cracking in the secondary lining of tunnels in schist; 2) cracks are mainly located at the shallow-buried entrance and exit sections; 3) numbers of cracks in the first excavated tunnel are higher than that in the tunnel excavated later; 4) the cracking pattern is mainly oblique; 5) it is easier for the secondary lining to crack at places where large deformation and collapse occur; 6) and cracking occurs 5 months after the completion of the secondary lining. Based on the above experience, laboratory tests and site investigation, the mechanism and reasons for cracking of the secondary lining were studied and it was concluded that the schist is often soft when water is encountered due to its low strength; it is difficult to complete an arch at the shallow-buried section of the entrance; asymmetrical loading is very common; the settlements at the tunnel invert are uneven; and the rock is affected by underground water and the creep effect. The following suggestions and measures are presented: the grade of surrounding rock will be adjusted; much attention should be paid to construction at the entrance and the design of middle rock pillar stability of tunnels with small spaces.
KeywordsHighway tunnel,   Lining cracks,   Schist     
基金资助:

基金项目: 河北省教育厅青年基金资助项目 (QN2016252);河北大学中西部提升综合实力专项资金资助项目

作者简介: 作者简介: 余 莉 (1985-), 女, 讲师, 博士, 主要从事岩土工程、 地下建筑工程方面的研究工作, E-mail: 964630415@qq.com.
引用本文:   
.片岩隧道群衬砌开裂特征与机理分析[J]  现代隧道技术, 2017,V54(2): 26-33
.Analysis of the Characteristics and Mechanism of Lining Cracking for a Tunnel Group in Schist[J]  MODERN TUNNELLING TECHNOLOGY, 2017,V54(2): 26-33
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2017/V54/I2/26
 
没有本文参考文献
[1] 李瑞俊1 宋宗莹2 李 琛1 王文斌2 任育珍3,4 蔡建华3,4 张家旭3,4.重载铁路梁家山隧道病害多源融合诊断与处置对策[J]. 现代隧道技术, 2025,62(4): 301-308
[2] 张小龙.桩基荷载作用下地铁盾构隧道结构力学响应分析[J]. 现代隧道技术, 2025,62(4): 82-89
[3] 李克玺1,2 党建东3 张 见3 叶光祥4 王晓军1,2 陈青林1,2 曹世荣2 张 河1,2.基于声发射特征参数的不同类型砂岩破裂特征研究[J]. 现代隧道技术, 2025,62(4): 26-36
[4] 周彩荣1 易黎明1 马山青2 周 蠡3 于金弘4,5.三点加载下高性能纤维混凝土顶管承载特性及配筋方案研究[J]. 现代隧道技术, 2025,62(4): 50-60
[5] 郭永军1 李 超2 郑建国3 于永堂4 朱才辉5.地面堆载对西安黄土地层中既有盾构管片影响研究[J]. 现代隧道技术, 2025,62(4): 61-72
[6] 王永刚1 崔翌堃1 吴九七2,3 黄 俊4 沈 翔2,3 杨 奎4 苏 栋2,3.考虑不同磨损形式下的滚刀受力与磨损对比分析[J]. 现代隧道技术, 2025,62(4): 73-81
[7] 冯冀蒙1,2 宋佳黛1,2 王圣涛3 李艺飞1,2 张俊儒1,2 王好明4 汪 波1,2.填海地层特大断面隧道超长管棚变形控制 效能研究[J]. 现代隧道技术, 2025,62(4): 155-162
[8] 徐才坚1 陈星宇1 雷明林1 张兴龙2 孙怀远2 李晓军2.隧道施工掌子面前方围岩富水性数字孪生与风险决策[J]. 现代隧道技术, 2025,62(4): 90-99
[9] 杨 颖1 倪 凯1 葛 林2 张明飞3 王晓睿4.弱光条件下基于改进Unet模型的隧道渗水病害图像分割[J]. 现代隧道技术, 2025,62(4): 100-110
[10] 苏开春1 付 锐2,3 曾弘锐2,3 冷希乔4 郭 春2,3.基于DBO-A-LSTM的公路隧道短时多步交通量预测[J]. 现代隧道技术, 2025,62(4): 111-121
[11] 熊 颖1,2 张俊儒1,2 范子焱1,2 陈佳豪1,2 马荐驰1,2 陈鹏涛1,2 谭瑞锋3,4.层状软岩中爆破应力波传播与振动衰减特性研究[J]. 现代隧道技术, 2025,62(4): 122-131
[12] 刘 杨1 邵泽楷2 田浩帆2 张汝溪1 郑 波3 王峥峥2.高速公路隧道下穿房柱式煤矿采空区爆破施工煤柱 损伤规律研究[J]. 现代隧道技术, 2025,62(4): 132-144
[13] 罗志洋1 张春瑜2,3 王立川1,2,4,5 徐 烁1 李利平4 王倩倩5 刘志强6.TBM裂隙岩体隧洞涌水机制及注浆堵水研究[J]. 现代隧道技术, 2025,62(4): 145-154
[14] 周弋力1 封 坤1 郭文琦1 张亮亮2 李春林3.超大直径盾构隧道管片纵缝抗弯力学行为与损伤过程研究[J]. 现代隧道技术, 2025,62(4): 163-173
[15] 易 丹1 薛皓匀2 杨绍毅2 喻 波1 封 坤2 林 刚1.盾构隧道管片结构螺栓失效对横向地震响应的影响分析[J]. 现代隧道技术, 2025,62(4): 174-181
Copyright 2010 by 现代隧道技术