邻近既有深基坑的盾构法隧道施工地层变位分析
(1 上海海洋地质勘察设计有限公司, 上海 200120; 2 苏州科技学院土木工程学院, 苏州215011;3 苏州相城区建设工程质量监督站, 苏州 215131)
Analysis of Stratum Deformation Induced by Shield Construction Adjacent to an Existing Deep Foundation Pit
(1 Shanghai Marine Geological Exploration and Design Co. Ltd., Shanghai 200120; 2 School of Civil Engineering of Suzhou University of Science & Technology, Suzhou 215011; 3 Construction Quality Supervision Station of Xiangcheng District, Suzhou 215131)
Download: PDF (2700KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 文章针对盾构隧道邻近深基坑推进的工况, 进行室内缩尺模型试验, 并建立了对应工况下的盾构隧道-土体-基坑围护结构三部分共同作用的三维有限元计算模型。通过对比同一工况下的室内模型试验和数值计算结果, 验证了三维数值分析的可行性和可靠性; 得到了邻近既有深基坑的盾构法隧道施工引起周边地表沉降的分布特点及其变化规律; 分析了盾构隧道开挖引起的横断面不同深度处地层位移的特点; 分析了隧道上方的地表沉降分布受邻近既有基坑的影响及沉降值随盾构隧道推进进度的变化规律, 得到了盾构隧道对基坑围护结构的位移影响情况; 并提出了盾构隧道施工过程中对周边地表沉降、 地层变位及基坑围护结构位移与变形进行实时监测的建议。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
关键词:   
Abstract: In light of the construction of a shield tunnel adjacent to an existing deep foundation pit, a scaled model test is conducted and a 3D FEM calculation model is established regarding the combined functions of the tunnel,soil mass and enclosure of the deep foundation pit. Based on a comparison of an indoor model test and numerical calculation results, the feasibility and reliability of the 3D numerical analysis is verified; the distribution characteristics and variation law of the surrounding surface settlements induced by shield tunnel construction adjacent to an existing deep foundation pit are obtained; shield tunnel construction induced displacement characteristics of the stratum of cross sections at different depths, the surface settlement distribution affected by the adjacent existing foundation pit, and the law of settlement varying with shield tunnel driving are analyzed; the displacement of the foundation pit enclosure affected by the shield tunnel is determined; and real-time monitoring is suggested for the surface settlement, stratum deformation and displacement and deformation of the foundation pit enclosure during shield tunnel construction.
KeywordsShield tunnel,   Deep foundation pit,   3D numerical analysis,   Stratum deformation     
基金资助:

基金项目: 住房与城乡建设部科学技术项目 (2012-K3-25) .

作者简介: 作者简介: 孙雷江(1988-), 男, 工学硕士, 从事岩土工程研究工作,E-mail: xuyuliny
引用本文:   
.邻近既有深基坑的盾构法隧道施工地层变位分析[J]  现代隧道技术, 2017,V54(2): 114-120
.Analysis of Stratum Deformation Induced by Shield Construction Adjacent to an Existing Deep Foundation Pit[J]  MODERN TUNNELLING TECHNOLOGY, 2017,V54(2): 114-120
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2017/V54/I2/114
 
没有本文参考文献
[1] 刘飞香 1,2.SCDZ133智能型隧道多功能作业台车及其施工技术[J]. 现代隧道技术, 2019,56(4): 1-7
[2] 周文波 吴惠明 赵 峻.泥岩地层常压刀盘盾构的掘进策略与分析[J]. 现代隧道技术, 2019,56(4): 8-15
[3] 陈卓立 1,2 朱训国 1,2 赵德深 1,2 王云平 1,2.深埋隧洞让压支护结构的锚固机理探究[J]. 现代隧道技术, 2019,56(4): 16-22
[4] 王全胜.矩形盾构法隧道管片分块案例分析及分块原则[J]. 现代隧道技术, 2019,56(4): 23-29
[5] 张 恒 1 朱亦墨 1 林 放 1 陈寿根 1 杨家松 2.基于Q系统的地下洞库中台阶最佳开挖高度研究[J]. 现代隧道技术, 2019,56(4): 30-37
[6] 李 好.大断面岩溶隧道贯通段地质情况的无线电波透视试验探测[J]. 现代隧道技术, 2019,56(4): 38-42
[7] 岑培山 1 田坤云 2 王喜民 3.蒙华铁路阳山隧道瓦斯危害性评估研究[J]. 现代隧道技术, 2019,56(4): 43-49
[8] 朱建峰 1 宫全美 2.软土地层盾构隧道长期沉降离心试验研究[J]. 现代隧道技术, 2019,56(4): 49-55
[9] 陈柚州 1 任 涛 2 邓 朋 2 王 斌 3.基于人工蜂群优化小波神经网络的隧道沉降预测[J]. 现代隧道技术, 2019,56(4): 56-61
[10] 王登茂 滕振楠 田志宇 陈志学.桃园至巴中高速公路八庙隧道非常规岩爆段病害处治与设计反思[J]. 现代隧道技术, 2019,56(4): 62-68
[11] 吴树元 1 程 勇 1 谢全敏 2 刘继国 1 陈必光 1.西藏米拉山隧道围岩大变形成因分析[J]. 现代隧道技术, 2019,56(4): 69-73
[12] 王 睢 1,2,3 钟祖良 3 刘新荣 3 吴 波 1,2,4 赵勇博 1,2 李占涛 1,2.基于D-P准则有压圆形衬砌隧洞弹塑性解[J]. 现代隧道技术, 2019,56(4): 74-80
[13] 李 明 严松宏 潘春阳 张旭斌.富水大断面黄土隧道开挖流固耦合效应分析[J]. 现代隧道技术, 2019,56(4): 81-88
[14] 张 凯 1 陈寿根 2 霍晓龙 3 谭信荣 4.岩溶地区隧道涌水风险的可拓评价模型及应用[J]. 现代隧道技术, 2019,56(4): 89-96
[15] 李 杰 1 张 斌 1 付 柯 1 马 超 1 郭京波 1 牛得草 2.基于现场掘进数据的复合地层盾构掘进性能预测方法研究[J]. 现代隧道技术, 2019,56(4): 97-104