[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2017, Vol. 54 Issue (5) :200-208    DOI:
施工技术 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
极小净距交叠隧道下行双线施工间距优化研究
(1山东科技大学山东省土木工程防灾减灾重点实验室,青岛 266590;2中铁十七局集团第一工程有限公司,太原030032;3 济南轨道交通集团有限公司,济南 250101))
Optimization for Excavation Spacing of Two Lower Tunnel Tubes at Overlapped Section with a Minimum Clear Distance
(1 College of Civil Engineering and Architecture, Shandong University of Science and Technology Qingdao, Shandong 266590; 2 No.1Engineering Co., Ltd. of China Railway Construction 17 Bureau Group Ltd., Taiyuan 030032; 3 Ji′nan Rail Transit Group Co., Ltd.,Jinan 250101)
Download: PDF (3586KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 针对极小净距交叠隧道受力复杂、爆破不易控制及支护困难等特点,文章以青岛地铁枣李区间隧道交叠段为研究对象,对下行隧道五种不同开挖间距进行数值模拟,分析了下行双线不同间距下地表及拱顶沉降分布特征。结合数值计算及理论分析对不同开挖间距下的围岩稳定性及施工经济性进行研究。结果表明:随着两平行隧道交错开挖间距的增大,隧道上方地表沉降、拱顶沉降和塑性区体积逐渐减小,但与此同时施工工期将会延长,工程支出相应增加,最终通过多指标综合判别确定出隧道左、右线交错开挖间距在 25~35 m时较为合理。研究成果确保了极小净距交叠隧道施工的安全稳定及经济可行性,可为同类工程建设提供理论依据和实践经验。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
关键词:   
Abstract: Aimed at addressing the complex force conditions, challenges to blasting and support in overlapping tun? nels with a minimum clear distance, a numerical simulation is carried out for lower tunnel tubes regarding five kinds of excavation spacing. The distribution features of the surface and crown settlements of two lower tunnel tubes for different excavation spacings are analyzed based on the Zaoshanlu-Lichun running tunnel project of the Qingdao metro, and the stability of the rock mass and construction costs for different excavation spacings are studied by numerical calculations and theoretical analysis. The results show that the surface settlement, vault settlement and volume of the plastic zone will decrease gradually with an increase of the excavation space between the parallel tunnel tubes, along with the extension of construction period and the increasing of expenses; so a reasonable excavation spacing between the left and right tube is 25~35 m determined by the multi-index comprehensive assessment meth? od.
KeywordsMinimum clear spacing,   Overlapped tunnels,   Construction procedure,   Economy,   Optimization analysis     
基金资助:

基金项目:国家自然科学基金项目(41472280,51174128)

作者简介: 作者简介:王渭明(1954-),男,博士,教授,博士生导师,从事岩石力学与地下工程方面的教学与科研工作,E-mail:wang@sdust.edu.cn.
引用本文:   
.极小净距交叠隧道下行双线施工间距优化研究[J]  现代隧道技术, 2017,V54(5): 200-208
.Optimization for Excavation Spacing of Two Lower Tunnel Tubes at Overlapped Section with a Minimum Clear Distance[J]  MODERN TUNNELLING TECHNOLOGY, 2017,V54(5): 200-208
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2017/V54/I5/200
 
没有本文参考文献
[1] 刘飞香 1,2.SCDZ133智能型隧道多功能作业台车及其施工技术[J]. 现代隧道技术, 2019,56(4): 1-7
[2] 周文波 吴惠明 赵 峻.泥岩地层常压刀盘盾构的掘进策略与分析[J]. 现代隧道技术, 2019,56(4): 8-15
[3] 陈卓立 1,2 朱训国 1,2 赵德深 1,2 王云平 1,2.深埋隧洞让压支护结构的锚固机理探究[J]. 现代隧道技术, 2019,56(4): 16-22
[4] 王全胜.矩形盾构法隧道管片分块案例分析及分块原则[J]. 现代隧道技术, 2019,56(4): 23-29
[5] 张 恒 1 朱亦墨 1 林 放 1 陈寿根 1 杨家松 2.基于Q系统的地下洞库中台阶最佳开挖高度研究[J]. 现代隧道技术, 2019,56(4): 30-37
[6] 李 好.大断面岩溶隧道贯通段地质情况的无线电波透视试验探测[J]. 现代隧道技术, 2019,56(4): 38-42
[7] 岑培山 1 田坤云 2 王喜民 3.蒙华铁路阳山隧道瓦斯危害性评估研究[J]. 现代隧道技术, 2019,56(4): 43-49
[8] 朱建峰 1 宫全美 2.软土地层盾构隧道长期沉降离心试验研究[J]. 现代隧道技术, 2019,56(4): 49-55
[9] 陈柚州 1 任 涛 2 邓 朋 2 王 斌 3.基于人工蜂群优化小波神经网络的隧道沉降预测[J]. 现代隧道技术, 2019,56(4): 56-61
[10] 王登茂 滕振楠 田志宇 陈志学.桃园至巴中高速公路八庙隧道非常规岩爆段病害处治与设计反思[J]. 现代隧道技术, 2019,56(4): 62-68
[11] 吴树元 1 程 勇 1 谢全敏 2 刘继国 1 陈必光 1.西藏米拉山隧道围岩大变形成因分析[J]. 现代隧道技术, 2019,56(4): 69-73
[12] 王 睢 1,2,3 钟祖良 3 刘新荣 3 吴 波 1,2,4 赵勇博 1,2 李占涛 1,2.基于D-P准则有压圆形衬砌隧洞弹塑性解[J]. 现代隧道技术, 2019,56(4): 74-80
[13] 李 明 严松宏 潘春阳 张旭斌.富水大断面黄土隧道开挖流固耦合效应分析[J]. 现代隧道技术, 2019,56(4): 81-88
[14] 张 凯 1 陈寿根 2 霍晓龙 3 谭信荣 4.岩溶地区隧道涌水风险的可拓评价模型及应用[J]. 现代隧道技术, 2019,56(4): 89-96
[15] 李 杰 1 张 斌 1 付 柯 1 马 超 1 郭京波 1 牛得草 2.基于现场掘进数据的复合地层盾构掘进性能预测方法研究[J]. 现代隧道技术, 2019,56(4): 97-104
Copyright 2010 by 现代隧道技术