上软下硬地层地铁隧道下穿既有城市道路的变形规律及控制措施研究
(1 山东大学土建与水利学院, 济南 250061;2 济南市市政工程设计研究院(集团)有限责任公司,济南 250101;3 山东大学岩土与结构工程研究中心, 济南 250061)
Deformation Law of a Metro Tunnel underneath an Existing Urban Road in Combination Soft/Hard Stratum
(1 School of Civil Engineering, Shandong University, Jinan 250061; 2 Jinan Municipal Engineering Design & Research Institute(Group) Co. Ltd., Jinan 250101; 3 Geotechnical and Structural Engineering Research Institute, Shandong University, Jinan 250061)
Download: PDF (5120KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 在上软下硬地层中进行隧道开挖时,常引起较大的地表沉降,危及既有建(构)筑物。文章依托深圳地铁7号线安托山停车场出入线下穿深圳北环大道工程,采用数值模拟和现场监控量测相结合的方法,利用三维有限差分软件 FLAC3D建立了下穿施工过程数值计算模型,分析“八”字形隧道下穿既有道路施工过程中,路面沉降特性及地层沉降规律,并通过现场多种监控量测手段加以对比验证。研究结果表明:地表沉降槽总体呈“人”字型,在隧道间距小于2.0D时,左右隧道拱顶沉降槽叠加效应明显。在隧道间距小于4.0D时,地表沉降有较大叠加;左右隧道开挖引起的上覆地层变形影响范围随深度增加而减小,减小速度随地层深度增加而增加;通过分析模拟过程中每一开挖步引起的地表沉降量,论述了超前支护措施对控制地表沉降的作用,并就超前注浆参数进行对比研究,进而优化了施工工法与支护对策。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
关键词:   
Abstract: Large surface settlement is often caused by tunnel construction in a stratum with a soft upper part and hard lower part, and this endangers any existing buildings. Based on the Antuo-Mountain Entrance/Exit Line project of Shenzhen subway line 7 underneath the North Ring Road, a numerical calculation model is set up by three-dimensional finite differential software FLAC3D under combination of numerical simulation and field monitoring to analyze the characteristics of ground surface settlement and stratum settlement during construction of the V-shaped tunnel underneath the existing road, and a comparison and demonstration is conducted by field monitoring and measurement. The results show: 1) the ground settlement trough mainly presents in a Y shape; 2) the superposed effect of the crown settlement trough is obvious when the interval of two tunnels is less than 2.0D, and the superposition of ground surface settlement increases greatly when the interval of two tunnels is less than 4.0D; and 3) the influential scope of overlying ground deformation decreases with an increase of the depth. The effect of advanced support on ground surface settlement is described and a comparative study of the parameters for advanced grouting is conducted so that the construction method and support measures are optimized.
KeywordsStratum with a soft upper part and a hard lower part,   Metro tunnel,   Numerical simulation,   Ground sur? face settlement,   Grouting parameters,   Monitoring and measurement     
基金资助:

基金项目:山东省自然科学基金(ZR2017MEE051);国家自然科学基金项目(51308323).

作者简介: 作者简介:武 科(1978- ),男,博士,副教授,硕士生导师,主要从事岩土工程灾害预警与治理方面的研究,E-mail:hssdu@163.com.
引用本文:   
.上软下硬地层地铁隧道下穿既有城市道路的变形规律及控制措施研究[J]  现代隧道技术, 2017,V54(6): 126-135
.Deformation Law of a Metro Tunnel underneath an Existing Urban Road in Combination Soft/Hard Stratum[J]  MODERN TUNNELLING TECHNOLOGY, 2017,V54(6): 126-135
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2017/V54/I6/126
 
没有本文参考文献
[1] 刘飞香 1,2.SCDZ133智能型隧道多功能作业台车及其施工技术[J]. 现代隧道技术, 2019,56(4): 1-7
[2] 周文波 吴惠明 赵 峻.泥岩地层常压刀盘盾构的掘进策略与分析[J]. 现代隧道技术, 2019,56(4): 8-15
[3] 陈卓立 1,2 朱训国 1,2 赵德深 1,2 王云平 1,2.深埋隧洞让压支护结构的锚固机理探究[J]. 现代隧道技术, 2019,56(4): 16-22
[4] 王全胜.矩形盾构法隧道管片分块案例分析及分块原则[J]. 现代隧道技术, 2019,56(4): 23-29
[5] 张 恒 1 朱亦墨 1 林 放 1 陈寿根 1 杨家松 2.基于Q系统的地下洞库中台阶最佳开挖高度研究[J]. 现代隧道技术, 2019,56(4): 30-37
[6] 李 好.大断面岩溶隧道贯通段地质情况的无线电波透视试验探测[J]. 现代隧道技术, 2019,56(4): 38-42
[7] 岑培山 1 田坤云 2 王喜民 3.蒙华铁路阳山隧道瓦斯危害性评估研究[J]. 现代隧道技术, 2019,56(4): 43-49
[8] 朱建峰 1 宫全美 2.软土地层盾构隧道长期沉降离心试验研究[J]. 现代隧道技术, 2019,56(4): 49-55
[9] 陈柚州 1 任 涛 2 邓 朋 2 王 斌 3.基于人工蜂群优化小波神经网络的隧道沉降预测[J]. 现代隧道技术, 2019,56(4): 56-61
[10] 王登茂 滕振楠 田志宇 陈志学.桃园至巴中高速公路八庙隧道非常规岩爆段病害处治与设计反思[J]. 现代隧道技术, 2019,56(4): 62-68
[11] 吴树元 1 程 勇 1 谢全敏 2 刘继国 1 陈必光 1.西藏米拉山隧道围岩大变形成因分析[J]. 现代隧道技术, 2019,56(4): 69-73
[12] 王 睢 1,2,3 钟祖良 3 刘新荣 3 吴 波 1,2,4 赵勇博 1,2 李占涛 1,2.基于D-P准则有压圆形衬砌隧洞弹塑性解[J]. 现代隧道技术, 2019,56(4): 74-80
[13] 李 明 严松宏 潘春阳 张旭斌.富水大断面黄土隧道开挖流固耦合效应分析[J]. 现代隧道技术, 2019,56(4): 81-88
[14] 张 凯 1 陈寿根 2 霍晓龙 3 谭信荣 4.岩溶地区隧道涌水风险的可拓评价模型及应用[J]. 现代隧道技术, 2019,56(4): 89-96
[15] 李 杰 1 张 斌 1 付 柯 1 马 超 1 郭京波 1 牛得草 2.基于现场掘进数据的复合地层盾构掘进性能预测方法研究[J]. 现代隧道技术, 2019,56(4): 97-104
Copyright 2010 by 现代隧道技术