港珠澳大通道拱北隧道暗挖段变形缝合理设置间距研究

Proper Spacing of the Deformation Joints of a Bored Section of the Gongbei Tunnel

  • 摘要: 变形缝的设置是为了解决地基不均匀沉降和混凝土收缩可能带来的结构物破坏问题,但其增加了隧道防水的难度。尽管目前隧道界有尽量少设变形缝的呼声,但是对于变形缝的设置间距,缺乏定量分析方法。文章依托港珠澳大通道拱北隧道工程实例,结合隧道实际的地质情况和结构型式,通过数值计算,从定量的角度分析变形缝的合理设置间距。研究结果表明:(1)如果不考虑底部管幕对地基的增强作用,即使设置 22 m间距的变形缝也不能满足结构安全性要求;(2)考虑底部管幕作用时,提出的变形缝间距 88 m是可行的;(3)考虑隧道全周管幕对地基的增强作用时,从纵向应力和竖向位移考虑,暗挖段可不设置变形缝。但考虑隧道运营后可能出现的地基不均匀沉降等复杂情况,从安全、经济的角度出发,并考虑施工方便,拱北隧道暗挖段变形缝间距可按不超过 88 m设置。

     

    Abstract: A deformation joint is meant to solve the problem of structural damage induced by differential settle? ment or concrete shrinkage, but it can make it difficult to achieve a watertight tunnel. Despite the use of deformation joints, there is still a lack of quantitative analysis regarding the spacing of deformation joints. Based on the actual geological conditions and structural forms of the Gongbei tunnel on the Hongkong-Zhuhai-Macao throughfare, proper spacing of deformation joints is analyzed quantitatively by simulation. The results show that: 1) if the reinforcement effect of the pipe roof under the tunnel base is not considered,it can not meet the safety requirements for the structure, even at a deformation joint space of 22 m; 2) if the reinforcement effect of the pipe roof under the tunnel base is considered, a deformation joint space of 88 m is feasible; and 3) if the reinforcement effect of the pipe roof around the tunnel is considered, the deformation joint can be canceled for the bored section from the view of the horizontal stress and vertical displacement. A deformation joint space of no more than 88 m is feasible for the bored section of the Gongbei tunnel for the sake of safety, economy and convenience considering the differential settlement that may occur at the foundation after tunnel operation.

     

/

返回文章
返回