深大竖井及转隧道正洞施工技术与安全分析
(1湖南科技大学土木工程学院 岩土工程稳定控制与健康监测省重点实验室,湘潭 411201;2中南大学土木工程学院,长沙 410075;3广西大学土木工程学院,南宁 530004)
Construction Techniques and Safety Analysis for a Deep Vertical Shaft and Vertical Shaft Shifting to Main Tunnel
(1 Hunan Provincial Key Laboratory of Geotechnical Engineering for Stability Control and Health Monitoring, School of Civil Engineering, Hunan University of Science and Technology, Xiangtan 411201; 2 School of Civil Engineering, Central South University,Changsha 410075; 3 College of Civil Engineering and Architecture, Guangxi University, Nanning 530004)
Download: PDF (5895KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 文章依托浏阳河隧道工程 2号深大竖井施工实例,结合工程地质情况及施工中遇到的问题,提出了竖井施工技术及竖井转正洞的施工方案,即竖井采用明挖逆筑法施工,围护桩及喷锚支护与衬砌共同构成刚度较大的封闭式环状水平受力结构,竖井转正洞与竖井落底同步进行的施工方法,有利地解决了正洞开挖存在作业平台过高的问题。文章针对具体的施工过程建立了仿真模型,结合现场监测情况,分析了该施工方法的安全性。实施效果表明:地层位移、竖井的初期支护、竖井的二次衬砌、隧道正洞的初期支护受力均满足安全要求。竖井转正洞施工过程中,隧道正洞初期支护的较大弯矩集中在拱脚附近,最大弯矩随着开挖而增大。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
关键词:   
Abstract: Considering the geological conditions and problems encountered in construction, the vertical shaft con? struction technique and construction program for vertical shaft shifting to the main tunnel are proposed based on the No.2 shaft of the Liuyang river tunnel, for which the top-down construction method is adopted for the vertical shaft;an enclosed circular horizontal force- bearing structure with great stiffness is formed by the retaining piles, shotcrete-bolt support and lining; and the construction of the vertical shaft shifting to the main tunnel and the vertical shaft construction at the bottom are performed simultaneously, solving the problem of a high operating platform during main tunnel excavation. A simulation model is established, and the safety of this construction method is analyzed considering the onsite monitoring results. Implementation result shows that the ground displacement, the force on initial support and secondary lining of the vertical shaft and the force on the initial support of the main tunnel meet the safety requirements, and the large bending moments of the initial support of the main tunnel are mainly concentrated near the tunnel arch spring during the construction of the vertical shaft shifting to the main tunnel, with the maximum bending moment increasing with excavation.
KeywordsTunnel engineering,   Shaft construction,   Shaft shifting to the main tunnel,   Construction technique,   Safe? ty analysis     
基金资助:

基金项目:国家自然科学基金项目(51408216,51308209); 湖南省学位与研究生教育教改课题(2017B082);湖南科技大学研究生培养改革研究项目(J151101).

作者简介: 作者简介:安永林(1981-),男,博士,副教授,主要从事隧道与地下工程的研究工作,E-mail: aylcsu@163.com.
引用本文:   
.深大竖井及转隧道正洞施工技术与安全分析[J]  现代隧道技术, 2018,V55(2): 164-173
.Construction Techniques and Safety Analysis for a Deep Vertical Shaft and Vertical Shaft Shifting to Main Tunnel[J]  MODERN TUNNELLING TECHNOLOGY, 2018,V55(2): 164-173
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2018/V55/I2/164
 
没有本文参考文献
[1] 刘飞香 1,2.SCDZ133智能型隧道多功能作业台车及其施工技术[J]. 现代隧道技术, 2019,56(4): 1-7
[2] 周文波 吴惠明 赵 峻.泥岩地层常压刀盘盾构的掘进策略与分析[J]. 现代隧道技术, 2019,56(4): 8-15
[3] 陈卓立 1,2 朱训国 1,2 赵德深 1,2 王云平 1,2.深埋隧洞让压支护结构的锚固机理探究[J]. 现代隧道技术, 2019,56(4): 16-22
[4] 王全胜.矩形盾构法隧道管片分块案例分析及分块原则[J]. 现代隧道技术, 2019,56(4): 23-29
[5] 张 恒 1 朱亦墨 1 林 放 1 陈寿根 1 杨家松 2.基于Q系统的地下洞库中台阶最佳开挖高度研究[J]. 现代隧道技术, 2019,56(4): 30-37
[6] 李 好.大断面岩溶隧道贯通段地质情况的无线电波透视试验探测[J]. 现代隧道技术, 2019,56(4): 38-42
[7] 岑培山 1 田坤云 2 王喜民 3.蒙华铁路阳山隧道瓦斯危害性评估研究[J]. 现代隧道技术, 2019,56(4): 43-49
[8] 朱建峰 1 宫全美 2.软土地层盾构隧道长期沉降离心试验研究[J]. 现代隧道技术, 2019,56(4): 49-55
[9] 陈柚州 1 任 涛 2 邓 朋 2 王 斌 3.基于人工蜂群优化小波神经网络的隧道沉降预测[J]. 现代隧道技术, 2019,56(4): 56-61
[10] 王登茂 滕振楠 田志宇 陈志学.桃园至巴中高速公路八庙隧道非常规岩爆段病害处治与设计反思[J]. 现代隧道技术, 2019,56(4): 62-68
[11] 吴树元 1 程 勇 1 谢全敏 2 刘继国 1 陈必光 1.西藏米拉山隧道围岩大变形成因分析[J]. 现代隧道技术, 2019,56(4): 69-73
[12] 王 睢 1,2,3 钟祖良 3 刘新荣 3 吴 波 1,2,4 赵勇博 1,2 李占涛 1,2.基于D-P准则有压圆形衬砌隧洞弹塑性解[J]. 现代隧道技术, 2019,56(4): 74-80
[13] 李 明 严松宏 潘春阳 张旭斌.富水大断面黄土隧道开挖流固耦合效应分析[J]. 现代隧道技术, 2019,56(4): 81-88
[14] 张 凯 1 陈寿根 2 霍晓龙 3 谭信荣 4.岩溶地区隧道涌水风险的可拓评价模型及应用[J]. 现代隧道技术, 2019,56(4): 89-96
[15] 李 杰 1 张 斌 1 付 柯 1 马 超 1 郭京波 1 牛得草 2.基于现场掘进数据的复合地层盾构掘进性能预测方法研究[J]. 现代隧道技术, 2019,56(4): 97-104
Copyright 2010 by 现代隧道技术