湿陷性黄土与地铁地下结构相互作用机理研究
(1 中铁第一勘察设计院集团有限公司,西安 710043;2 陕西省铁道及地下交通工程重点实验室,西安 710043;3 长安大学,西安 710064)
Study on Interaction Mechanism between Collapsible Loess and the Subway Underground Structure
(1 China Railway First Survey and Design Institute Group Co. Ltd., Xi′an 710043; 2 Shanxi Railway and Underground Traffic Engineering Key Laboratory (FSDI), Xi′an 710043; 3 Chang′an University, Xi′an 710064)
Download: PDF (2233KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 为研究湿陷性黄土与地铁地下结构相互作用机理,文章基于黄土地区地铁工程经验,通过理论分析探讨了地铁工程地基承载力工作原理、黄土地层中地下结构的土压力作用原理等,指出了地铁结构作为地下中空构筑物与一般工业与民用基础的区别;通过实例计算研究了地铁结构基底压力、黄土湿陷引起的结构侧向土压力及顶部土压力变化规律。研究结果表明:1)地铁地下结构工作原理不适用于地基土体侧向滑移并被挤出的传统与经典地基承载力理论,它产生的基底压力小于原基底土的自重压力,类似于地基与基础设计中有利的补偿性基础;2)黄土饱和浸水湿陷瞬间,土的抗剪强度是饱和快剪指标,其侧压力系数趋近于 1.0,设计时应予以考虑;3)黄土地层中如隧道洞身范围土体发生湿陷变形,隧道顶板所受的竖向土压力值较未发生湿陷变形时显著增大,设计时应予以考虑。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
关键词:   
Abstract: In order to study the interaction mechanism between collapsible loess and underground structure of the metro, the working principle of foundation bearing capacity of metro underground engineering and the principle of earth pressure acting on underground structure in loess stratum were discussed through theoretical analysis based on the experience of underground engineering in loess area. The differences between underground structure as underground hollow structure and general industrial and civil foundation were presented. The variations of base pressure,lateral earth pressure and top earth pressure caused by collapsibility of loess in underground structure of metro were studied through case calculations. The results show that: (1) the working principle of metro underground structure is not applicable to the traditional and classical theory of bearing capacity of foundation soil which is laterally slipping and extruded, and the base pressure generated is less than the self-weight pressure of original base soil and the base is similar to the favorable compensatory foundation in foundation and foundation design; (2) shear strength of loess is a saturated fast shear index at the moment of loess collapsing due to saturated water soaking, the lateral pressure coefficient approaches 1.0 which should be taken into account in design; (3) In loess stratum, if collapsible deformation of soil occurs within the scope of tunnel main body, the vertical earth pressure on tunnel roof increases significantly compared with that without collapsible deformation, which should be considered in design.
KeywordsCollapsible loess,   Metro engineering,   Compensated foundation,   Lateral pressure coefficient,   Vertical earth pressure     
作者简介: 作者简介:王立新(1983-),男,博士,高级工程师,注册岩土工程师、注册城乡规划师、注册咨询工程师,主要从事隧道与地下工程的设计、科研 及技术管理工作,E-mail:458601714@qq.com. 通讯作者:刘保健(1953-),男,博士,博士生导师,注册岩土工程师,长期从事岩土与隧道工程的教学与研究工作,E-mail:407218301@qq.com.
引用本文:   
.湿陷性黄土与地铁地下结构相互作用机理研究[J]  现代隧道技术, 2019,V56(1): 72-78
.Study on Interaction Mechanism between Collapsible Loess and the Subway Underground Structure[J]  MODERN TUNNELLING TECHNOLOGY, 2019,V56(1): 72-78
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2019/V56/I1/72
 
没有本文参考文献
[1] 刘飞香 1,2.SCDZ133智能型隧道多功能作业台车及其施工技术[J]. 现代隧道技术, 2019,56(4): 1-7
[2] 周文波 吴惠明 赵 峻.泥岩地层常压刀盘盾构的掘进策略与分析[J]. 现代隧道技术, 2019,56(4): 8-15
[3] 陈卓立 1,2 朱训国 1,2 赵德深 1,2 王云平 1,2.深埋隧洞让压支护结构的锚固机理探究[J]. 现代隧道技术, 2019,56(4): 16-22
[4] 王全胜.矩形盾构法隧道管片分块案例分析及分块原则[J]. 现代隧道技术, 2019,56(4): 23-29
[5] 张 恒 1 朱亦墨 1 林 放 1 陈寿根 1 杨家松 2.基于Q系统的地下洞库中台阶最佳开挖高度研究[J]. 现代隧道技术, 2019,56(4): 30-37
[6] 李 好.大断面岩溶隧道贯通段地质情况的无线电波透视试验探测[J]. 现代隧道技术, 2019,56(4): 38-42
[7] 岑培山 1 田坤云 2 王喜民 3.蒙华铁路阳山隧道瓦斯危害性评估研究[J]. 现代隧道技术, 2019,56(4): 43-49
[8] 朱建峰 1 宫全美 2.软土地层盾构隧道长期沉降离心试验研究[J]. 现代隧道技术, 2019,56(4): 49-55
[9] 陈柚州 1 任 涛 2 邓 朋 2 王 斌 3.基于人工蜂群优化小波神经网络的隧道沉降预测[J]. 现代隧道技术, 2019,56(4): 56-61
[10] 王登茂 滕振楠 田志宇 陈志学.桃园至巴中高速公路八庙隧道非常规岩爆段病害处治与设计反思[J]. 现代隧道技术, 2019,56(4): 62-68
[11] 吴树元 1 程 勇 1 谢全敏 2 刘继国 1 陈必光 1.西藏米拉山隧道围岩大变形成因分析[J]. 现代隧道技术, 2019,56(4): 69-73
[12] 王 睢 1,2,3 钟祖良 3 刘新荣 3 吴 波 1,2,4 赵勇博 1,2 李占涛 1,2.基于D-P准则有压圆形衬砌隧洞弹塑性解[J]. 现代隧道技术, 2019,56(4): 74-80
[13] 李 明 严松宏 潘春阳 张旭斌.富水大断面黄土隧道开挖流固耦合效应分析[J]. 现代隧道技术, 2019,56(4): 81-88
[14] 张 凯 1 陈寿根 2 霍晓龙 3 谭信荣 4.岩溶地区隧道涌水风险的可拓评价模型及应用[J]. 现代隧道技术, 2019,56(4): 89-96
[15] 李 杰 1 张 斌 1 付 柯 1 马 超 1 郭京波 1 牛得草 2.基于现场掘进数据的复合地层盾构掘进性能预测方法研究[J]. 现代隧道技术, 2019,56(4): 97-104
Copyright 2010 by 现代隧道技术