现代隧道技术 2019, Vol. 56 Issue (1) :176-184    DOI:
施工技术 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
城市地下立交隧道交叉口施工方法研究
(1中国电建集团华东勘测设计研究院有限公司,杭州 311122;2浙江省智慧轨道交通工程技术研究中心,杭州 311225;3成都理工大学地质灾害防治与地质环境保护国家重点实验室,成都 610059)
Study on Construction Method of the Intersection of the Urban Underground Interchange Tunnel
(1 Powerchina Huadong Engineering Corporation Limited, Hangzhou 311122; 2 Zhengjiang Engineering Research Center of Smart Rail Transportation, Hangzhou 311225; 3 State Key Laboratory of Geohazard Prevention and Geoenvironment Protection, Chengdu University of Technology, Chengdu 610059)
Download: PDF (5635KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 城市立交隧道施工的难点在于两条隧道合并为一条隧道的交叉口施工,该处存在特大断面隧道、偏连拱隧道和小净距隧道型式的多重转换,施工风险高,对工法、工艺要求苛刻。文章以杭州市紫之隧道的地下立交交叉口工程为依托,提出了一种小洞开大洞,然后再横向开挖,最后反向开挖的施工方法和施工工序。结合工程特点,采用有限元数值模拟和监控量测方法验证了该施工方法的合理性。结果表明:对隧道交叉口采用导洞爬坡反向施工方法可以保证分叉段施工安全,解决小洞往大洞方向开挖的难题;分叉隧道开挖过程中,围岩所受拉应力主要集中在拱顶、拱底及中间岩柱上,所受压应力主要集中在中间岩柱及大拱拱腰、小净距外侧拱腰处;衬砌结构最大拉应力出现在拱底,最大压应力发生在拱腰处。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
关键词:   
Abstract: The construction difficulty of an urban underground interchange tunnel is focused on the intersection where two tunnel tubes are incorporated into one-tube tunnel, so the construction is of high risks and the requirements for construction method and technology are rigorous due to multiple conversion of tunnel system modes, such as the super-large section tunnel, the double-arch tunnel and the small-spacing tunnel. Based on construction practice of the underground intersection of Zizhi tunnel in Hangzhou, a construction method and procedure were proposed, namely constructing the large tube from the small tube, then transverse enlarging excavation and finally reverse excavation. The rationality of the proposed construction method was verified by using FEM numerical simulation and monitoring and measuring considering the characteristics of the project. The results show that the construction method of climbing excavation of the adit + transverse enlarging excavation + reverse construction can guarantee the construction safety of tunnel intersection, solve the difficulty excavating from a small tube to a large one; during the construction of the bifurcated tunnel, the tensile stress of surrounding rocks mainly concentrates on the vault,arch bottom and middle rock pillar while the compressive stress mainly concentrates on the middle rock pillar, the haunch of the large arch tunnel and the haunch outside of the small-spacing tunnel; the maximum tensile stress ofthe lining structure occurs at arch bottom and the maximum compressive stress occurs at haunch.
KeywordsUrban tunnel,   Underground interchange,   Intersection,   Climbing excavation from the pilot tunnel and reverse construction,   Numerical simulation     
基金资助:

基金项目:国家自然科学基金项目(51208069);四川省应用基础研究计划项目(2014JY0083).

作者简介: 作者简介:闫自海(1984-),男,工程师,主要从事隧道及地下工程方面的设计与研究工作,E-mail: 85383258@qq.com
引用本文:   
.城市地下立交隧道交叉口施工方法研究[J]  现代隧道技术, 2019,V56(1): 176-184
.Study on Construction Method of the Intersection of the Urban Underground Interchange Tunnel[J]  MODERN TUNNELLING TECHNOLOGY, 2019,V56(1): 176-184
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2019/V56/I1/176
 
没有本文参考文献
[1] 刘飞香 1,2.SCDZ133智能型隧道多功能作业台车及其施工技术[J]. 现代隧道技术, 2019,56(4): 1-7
[2] 周文波 吴惠明 赵 峻.泥岩地层常压刀盘盾构的掘进策略与分析[J]. 现代隧道技术, 2019,56(4): 8-15
[3] 陈卓立 1,2 朱训国 1,2 赵德深 1,2 王云平 1,2.深埋隧洞让压支护结构的锚固机理探究[J]. 现代隧道技术, 2019,56(4): 16-22
[4] 王全胜.矩形盾构法隧道管片分块案例分析及分块原则[J]. 现代隧道技术, 2019,56(4): 23-29
[5] 张 恒 1 朱亦墨 1 林 放 1 陈寿根 1 杨家松 2.基于Q系统的地下洞库中台阶最佳开挖高度研究[J]. 现代隧道技术, 2019,56(4): 30-37
[6] 李 好.大断面岩溶隧道贯通段地质情况的无线电波透视试验探测[J]. 现代隧道技术, 2019,56(4): 38-42
[7] 岑培山 1 田坤云 2 王喜民 3.蒙华铁路阳山隧道瓦斯危害性评估研究[J]. 现代隧道技术, 2019,56(4): 43-49
[8] 朱建峰 1 宫全美 2.软土地层盾构隧道长期沉降离心试验研究[J]. 现代隧道技术, 2019,56(4): 49-55
[9] 陈柚州 1 任 涛 2 邓 朋 2 王 斌 3.基于人工蜂群优化小波神经网络的隧道沉降预测[J]. 现代隧道技术, 2019,56(4): 56-61
[10] 王登茂 滕振楠 田志宇 陈志学.桃园至巴中高速公路八庙隧道非常规岩爆段病害处治与设计反思[J]. 现代隧道技术, 2019,56(4): 62-68
[11] 吴树元 1 程 勇 1 谢全敏 2 刘继国 1 陈必光 1.西藏米拉山隧道围岩大变形成因分析[J]. 现代隧道技术, 2019,56(4): 69-73
[12] 王 睢 1,2,3 钟祖良 3 刘新荣 3 吴 波 1,2,4 赵勇博 1,2 李占涛 1,2.基于D-P准则有压圆形衬砌隧洞弹塑性解[J]. 现代隧道技术, 2019,56(4): 74-80
[13] 李 明 严松宏 潘春阳 张旭斌.富水大断面黄土隧道开挖流固耦合效应分析[J]. 现代隧道技术, 2019,56(4): 81-88
[14] 张 凯 1 陈寿根 2 霍晓龙 3 谭信荣 4.岩溶地区隧道涌水风险的可拓评价模型及应用[J]. 现代隧道技术, 2019,56(4): 89-96
[15] 李 杰 1 张 斌 1 付 柯 1 马 超 1 郭京波 1 牛得草 2.基于现场掘进数据的复合地层盾构掘进性能预测方法研究[J]. 现代隧道技术, 2019,56(4): 97-104
Copyright 2010 by 现代隧道技术