倾斜坚硬岩层异型深基坑围护结构综合施工技术研究
(1河北东方学院,廊坊 065001;2中国轻工建设工程有限公司,廊坊 065001;3中铁三局集团有限公司,太原 030001)
Research on Comprehensive Construction Technology for Retaining Structure of Special-shaped Deep Foundation Pit in Inclined Hard Rock
(1 Hebei Oriental College,Langfang 065001; 2 China Light Industry Construction Co., Ltd., Langfang 065001; 3 China Railway No. 3 Engineering Group Co. Ltd., Taiyuan 030001)
Download: PDF (1107KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 针对倾斜坚硬岩石地段地下连续墙及钻孔桩施工困难、容易偏孔等难题,文章以某地铁车站深基坑围护结构施工为研究对象,通过理论研究及施工实践提出了旋挖钻机成孔+冲孔桩机成槽施工技术以及潜孔钻机+旋挖钻机成孔施工技术。结果表明:1)在坚硬岩石地段施工地下连续墙时,采用旋挖钻机间隔施工主孔,采用冲孔桩机进行副孔施工,可提高地下连续墙施工速度;2)在坚硬岩石地段施工钻孔桩难度较大,采用潜孔钻在桩位先进行梅花形钻孔,再用旋挖钻进行施工,施工速度提高明显;3)通过对旋挖钻机及潜孔钻垂直度的调整,避免了成槽成孔的倾斜,保证了在倾斜岩体中成槽成桩的垂直度;4)在倾斜坚硬岩石地段采用旋挖钻施工时,为了保证成孔成槽的垂直度,需对旋挖钻机的技术参数进行优化。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
关键词:   
Abstract: Aiming at the construction difficulties and hole deviation issuses of diaphragm retaining wall and bored pile in inclined hard rocks, the corresponding construction techniques of hole drilled by rotary drilling rig and trough constructed by piling machine, and bored hole drilled by down-the-hole drill rig + rotary drilling rig were proposed based on a theoretical and practical research, by taking the retaining structure construction of a deep foundation pit of a metro station as an example. The results show that: (1) in the construction of diaphragm retaining structure in hard rock, main holes are constructed with intervals by rotary drilling rig, and accessory holes are constructed by piling machine, which improves the construction speed of retaining structure; (2) It is difficult to construct the bored pile in the hard rock, and the quincunx bores are drilled by down-the-hole drill rig and then followed by rotary drilling, which greatly increases the construction speed; (3) by adjusting the perpendicularity of the rotary drilling rig and the down-the -hole drill rig, the inclination of troughs and holes is avoided, guaranteeing the perpen? dicularity in the inclined rock mass; (4) the technical parameters of rotary drilling rig should be optimized to guarantee the perpendicularity during the rotary drilling construction in inclined hard rocks.
KeywordsHard rock stratum,   Metro station,   Foundation pit,   Construction of diaphragm retaining structure,   Con? struction of bored pile     
作者简介: 作者简介:唐孝蓉(1979-),女,讲师,主要从事岩土工程领域的科研与教学工作,E-mail:364993540@qq.com. 通讯作者:孙伯乐(1984-),男,硕士,工程师,主要从事隧道及地下工程施工及管理工作,E-mail:418186487@qq.com.
引用本文:   
.倾斜坚硬岩层异型深基坑围护结构综合施工技术研究[J]  现代隧道技术, 2019,V56(1): 205-208
.Research on Comprehensive Construction Technology for Retaining Structure of Special-shaped Deep Foundation Pit in Inclined Hard Rock[J]  MODERN TUNNELLING TECHNOLOGY, 2019,V56(1): 205-208
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2019/V56/I1/205
 
没有本文参考文献
[1] 刘飞香 1,2.SCDZ133智能型隧道多功能作业台车及其施工技术[J]. 现代隧道技术, 2019,56(4): 1-7
[2] 周文波 吴惠明 赵 峻.泥岩地层常压刀盘盾构的掘进策略与分析[J]. 现代隧道技术, 2019,56(4): 8-15
[3] 陈卓立 1,2 朱训国 1,2 赵德深 1,2 王云平 1,2.深埋隧洞让压支护结构的锚固机理探究[J]. 现代隧道技术, 2019,56(4): 16-22
[4] 王全胜.矩形盾构法隧道管片分块案例分析及分块原则[J]. 现代隧道技术, 2019,56(4): 23-29
[5] 张 恒 1 朱亦墨 1 林 放 1 陈寿根 1 杨家松 2.基于Q系统的地下洞库中台阶最佳开挖高度研究[J]. 现代隧道技术, 2019,56(4): 30-37
[6] 李 好.大断面岩溶隧道贯通段地质情况的无线电波透视试验探测[J]. 现代隧道技术, 2019,56(4): 38-42
[7] 岑培山 1 田坤云 2 王喜民 3.蒙华铁路阳山隧道瓦斯危害性评估研究[J]. 现代隧道技术, 2019,56(4): 43-49
[8] 朱建峰 1 宫全美 2.软土地层盾构隧道长期沉降离心试验研究[J]. 现代隧道技术, 2019,56(4): 49-55
[9] 陈柚州 1 任 涛 2 邓 朋 2 王 斌 3.基于人工蜂群优化小波神经网络的隧道沉降预测[J]. 现代隧道技术, 2019,56(4): 56-61
[10] 王登茂 滕振楠 田志宇 陈志学.桃园至巴中高速公路八庙隧道非常规岩爆段病害处治与设计反思[J]. 现代隧道技术, 2019,56(4): 62-68
[11] 吴树元 1 程 勇 1 谢全敏 2 刘继国 1 陈必光 1.西藏米拉山隧道围岩大变形成因分析[J]. 现代隧道技术, 2019,56(4): 69-73
[12] 王 睢 1,2,3 钟祖良 3 刘新荣 3 吴 波 1,2,4 赵勇博 1,2 李占涛 1,2.基于D-P准则有压圆形衬砌隧洞弹塑性解[J]. 现代隧道技术, 2019,56(4): 74-80
[13] 李 明 严松宏 潘春阳 张旭斌.富水大断面黄土隧道开挖流固耦合效应分析[J]. 现代隧道技术, 2019,56(4): 81-88
[14] 张 凯 1 陈寿根 2 霍晓龙 3 谭信荣 4.岩溶地区隧道涌水风险的可拓评价模型及应用[J]. 现代隧道技术, 2019,56(4): 89-96
[15] 李 杰 1 张 斌 1 付 柯 1 马 超 1 郭京波 1 牛得草 2.基于现场掘进数据的复合地层盾构掘进性能预测方法研究[J]. 现代隧道技术, 2019,56(4): 97-104
Copyright 2010 by 现代隧道技术