[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2019, Vol. 56 Issue (3) :38-44    DOI:
研究与探讨 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
老城区双护盾 TBM地铁工程筹划技术研究
(1中铁第一勘察设计院集团有限公司,西安 710043;2陕西省铁道及地下交通工程重点实验室,西安 710043)
Study on the Planning Technology for Metro Built by Double Shield TBM in Old Urban Area
(1 China Railway First Survey and Design Institute Group Ltd., Xi′an 710043;2 Shaanxi Key Laboratory of Railway and Underground Traffic Engineering, Xi′an 710043)
Download: PDF (2559KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 青岛地铁 2 号线位于青岛市老城区,道路红线狭窄、建设用地紧张,采用双护盾 TBM 施工,需解决TBM掘进和车站施工相互干扰以及 TBM始发、过站、接收等技术难点。文章结合青岛老城区环境特点和地铁线站条件,提出了工程筹划的基本原则;通过对 TBM始发方案研究,提出了“轨排井+吊装井+始发洞始发技术”;通过对TBM过站方案研究,提出了“整机曲线过站技术”和“站内导洞过站技术”;通过对 TBM接收方案研究,提出了“存车线隧道+车站风井解体吊出技术”,总结形成了适用于老城区地铁工程建设的双护盾 TBM成套工程筹划技术,并成功应用于工程实践中,缓解了老城区地铁建设征拆难度大、交通资源紧张的矛盾。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
黄银钉 1
2
关键词:   
Abstract: The Qingdao metro line 2 is located in the old urban area with narrow boundary line of roads and short? age of construction land. With the double shield TBM, it′s necessary to solve the technical difficulties such as mutual interference between TBM excavation and station construction, TBM launching, TBM passing through station,TBM receiving and so on. In light of the environmental characteristics of Qingdao old urban area and the conditions of subway line and stations, the basic principles of project planning were presented; based on a study of TBM launching schemes, the technology of TBM launching from "rail row shaft + hoisting shaft +launching tunnel" was presented; by studying the schemes of TBM passing through station, the station crossing technologies of "station crossing of whole TBM by a curved guidance pedestal " and " station passing of TBM by pilot tunnel " were proposed; on the basis of a study on TBM receiving schemes, the technology of TBM disassembling and hoisting out from "rail siding tunnel + station air shaft " was put forward, and a comprehensive engineering planning technology of double shield TBM suitable for the metro construction in old urban area was summarized and applied in practice.
KeywordsOld urban area,   Metro engineering,   Double shield TBM,   Project planning,   Basic principle,   Launching technology scheme,   Station crossing scheme,   Receiving technology scheme     
作者简介: 作者简介:黄银钉(1980-),男,高级工程师,主要从事轨道交通设计工作,E-mail:20027634@qq.com.
引用本文:   
黄银钉 1, 2 .老城区双护盾 TBM地铁工程筹划技术研究[J]  现代隧道技术, 2019,V56(3): 38-44
HUANG Yinding1, 2 .Study on the Planning Technology for Metro Built by Double Shield TBM in Old Urban Area[J]  MODERN TUNNELLING TECHNOLOGY, 2019,V56(3): 38-44
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2019/V56/I3/38
 
没有本文参考文献
[1] 刘飞香 1,2.SCDZ133智能型隧道多功能作业台车及其施工技术[J]. 现代隧道技术, 2019,56(4): 1-7
[2] 周文波 吴惠明 赵 峻.泥岩地层常压刀盘盾构的掘进策略与分析[J]. 现代隧道技术, 2019,56(4): 8-15
[3] 陈卓立 1,2 朱训国 1,2 赵德深 1,2 王云平 1,2.深埋隧洞让压支护结构的锚固机理探究[J]. 现代隧道技术, 2019,56(4): 16-22
[4] 王全胜.矩形盾构法隧道管片分块案例分析及分块原则[J]. 现代隧道技术, 2019,56(4): 23-29
[5] 张 恒 1 朱亦墨 1 林 放 1 陈寿根 1 杨家松 2.基于Q系统的地下洞库中台阶最佳开挖高度研究[J]. 现代隧道技术, 2019,56(4): 30-37
[6] 李 好.大断面岩溶隧道贯通段地质情况的无线电波透视试验探测[J]. 现代隧道技术, 2019,56(4): 38-42
[7] 岑培山 1 田坤云 2 王喜民 3.蒙华铁路阳山隧道瓦斯危害性评估研究[J]. 现代隧道技术, 2019,56(4): 43-49
[8] 朱建峰 1 宫全美 2.软土地层盾构隧道长期沉降离心试验研究[J]. 现代隧道技术, 2019,56(4): 49-55
[9] 陈柚州 1 任 涛 2 邓 朋 2 王 斌 3.基于人工蜂群优化小波神经网络的隧道沉降预测[J]. 现代隧道技术, 2019,56(4): 56-61
[10] 王登茂 滕振楠 田志宇 陈志学.桃园至巴中高速公路八庙隧道非常规岩爆段病害处治与设计反思[J]. 现代隧道技术, 2019,56(4): 62-68
[11] 吴树元 1 程 勇 1 谢全敏 2 刘继国 1 陈必光 1.西藏米拉山隧道围岩大变形成因分析[J]. 现代隧道技术, 2019,56(4): 69-73
[12] 王 睢 1,2,3 钟祖良 3 刘新荣 3 吴 波 1,2,4 赵勇博 1,2 李占涛 1,2.基于D-P准则有压圆形衬砌隧洞弹塑性解[J]. 现代隧道技术, 2019,56(4): 74-80
[13] 李 明 严松宏 潘春阳 张旭斌.富水大断面黄土隧道开挖流固耦合效应分析[J]. 现代隧道技术, 2019,56(4): 81-88
[14] 张 凯 1 陈寿根 2 霍晓龙 3 谭信荣 4.岩溶地区隧道涌水风险的可拓评价模型及应用[J]. 现代隧道技术, 2019,56(4): 89-96
[15] 李 杰 1 张 斌 1 付 柯 1 马 超 1 郭京波 1 牛得草 2.基于现场掘进数据的复合地层盾构掘进性能预测方法研究[J]. 现代隧道技术, 2019,56(4): 97-104
Copyright 2010 by 现代隧道技术