砂卵石复合地层盾构隧道施工预加固技术

Pre-reinforcement Technology of Shield Tunnelling in Compound Stratum with Sand and Gravel

  • 摘要: 在复合地层中进行盾构隧道掘进时常常会面临掘进参数恶化、掘进速度下降等问题。基于此,文章针对成都地铁 1号线三期工程盾构隧道穿越砂卵石复合地层施工实例,采用地面注双液浆及管棚预加固技术对地层进行预加固处理。结果表明:地层经过预加固处理后,盾构掘进过程中刀盘扭矩和推力下降显著,掘进速度明显提高,两种预加固方式都能很好地改善盾构在复合地层中的掘进情况。

     

    Abstract: It is often to encounter deterioration of tunnelling parameters, decrease of advance rates and so on during shield tunnelling in compound stratum with sand and gravel. Pre-reinforcement techniques, which are composed of two-component grouting on ground and pipe-roof grouting in tunnel, were adopted in phase Ⅲ of Chengdu metro line 1 in compound stratum with sand and gravel. The results show that cutterhead torque and thrust decrease and advance rates increase significantly during shield tunnelling after ground pre-reinforcement, these two pre-reinforcement methods both can improve shield tunnelling in the compound stratum with sand and gravel.

     

/