现代隧道技术 2019, Vol. 56 Issue (3) :192-199    DOI:
材料与设备 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
福州地铁过江通道泥水盾构弃浆在壁后注浆材料中的再利用
(1中交第二航务工程局有限公司,武汉 430040;2长大桥梁建设施工技术交通行业重点实验室,武汉430040;3交通运输行业交通基础设施智能制造技术研发中心,武汉 430040)
Recycle Application of the Shield Waste Slurry in Backfill Grouting Material: A Case Study of a Slurry Shield Tunnelling in the River-crossing Fuzhou Metro
(1 CCCC Second Harbour Engineering Company Ltd., Wuhan 430040;2 Key Laboratory of Large-Span Bridge Construction Technology, Wuhan 430040;3 Research and Development Center of Transport Industry of Intelligent Manufacturing Technologies of Transport Infrastructure, Wuhan 430040)
Download: PDF (2536KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 采用泥水盾构掘进隧道会产生大量的废弃泥浆,其处理和运输不仅需花大量的费用,还有可能产生严重的环境污染问题。基于此,文章以福州地铁厚庭—桔园洲区间隧道泥水盾构下穿乌龙江施工为例,研究了利用泥水盾构废弃泥浆配制壁后注浆材料的可行性,采用正交试验对影响砂浆性质的水胶比、粉灰比、砂胶比、泥浆比重4个因素进行了综合优化,并探讨了它们对壁后注浆材料的影响规律。结果表明:(1)水胶比和泥浆比重是影响壁后注浆砂浆稠度、流动度和泌水率的主要因素;(2)水胶比和粉灰比是影响其凝结时间的主要因素;(3)水胶比、胶砂比和泥浆的比重是影响砂浆密度的主要因素;(4)通过控制泥浆比重和水胶比可以配制出工作性能和强度性能良好的壁后注浆材料。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
杨 钊 1
3 贺祖浩 1
2 刘 毅 1
2 陈培帅 1
2 李德杰 1
3
关键词:   
Abstract: A large amount of waste slurry would be generated in slurry shield tunnelling, and it will result in high cost of handling and transportation, even more serious pollution problem. Based on the Houting-Juyuan running tunnel section of the Fuzhou metro, which was driven by a slurry shield underneath the Wulong River, it studied the feasibility to prepare the backfilling grouting material with waste slurry generated from slurry shield excavation, optimized the four factors affecting mortar performance by the orthogonal test, discussed the effect law of water-cement ratio, flyash-cement ratio, cement-sand ratio and specific gravity of slurry on backfilling grouting material. The results show: 1) water-cement ratio and specific gravity of slurry are the main factors affecting mortar consistency, fluidity and bleeding rate; 2) water-cement ratio and flyash-cement ratio are the main factors affecting setting time; 3)water-cement ratio, cement-sand ratio and specific gravity of slurry are the main factors affecting mortar density; 4)by controlling specific gravity of slurry and water-cement ratio the backfilling grouting material can be prepared with good working and strength performances.
KeywordsSlurry shield,   River-crossing metro,   Waste slurry,   Material for backfilling grouting,   Orthogonal test,   Law of effect     
作者简介: 作者简介:杨 钊(1984-),男,博士,高级工程师,主要从事隧道及地下结构研究工作,E-mail:yangzhaolp@126.com.
引用本文:   
杨 钊 1, 3 贺祖浩 1, 2 刘 毅 1等 .福州地铁过江通道泥水盾构弃浆在壁后注浆材料中的再利用[J]  现代隧道技术, 2019,V56(3): 192-199
YANG Zhao1, 3 HE Zuhao1, 2 LIU Yi1 etc .Recycle Application of the Shield Waste Slurry in Backfill Grouting Material: A Case Study of a Slurry Shield Tunnelling in the River-crossing Fuzhou Metro[J]  MODERN TUNNELLING TECHNOLOGY, 2019,V56(3): 192-199
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2019/V56/I3/192
 
没有本文参考文献
[1] 刘飞香 1,2.SCDZ133智能型隧道多功能作业台车及其施工技术[J]. 现代隧道技术, 2019,56(4): 1-7
[2] 周文波 吴惠明 赵 峻.泥岩地层常压刀盘盾构的掘进策略与分析[J]. 现代隧道技术, 2019,56(4): 8-15
[3] 陈卓立 1,2 朱训国 1,2 赵德深 1,2 王云平 1,2.深埋隧洞让压支护结构的锚固机理探究[J]. 现代隧道技术, 2019,56(4): 16-22
[4] 王全胜.矩形盾构法隧道管片分块案例分析及分块原则[J]. 现代隧道技术, 2019,56(4): 23-29
[5] 张 恒 1 朱亦墨 1 林 放 1 陈寿根 1 杨家松 2.基于Q系统的地下洞库中台阶最佳开挖高度研究[J]. 现代隧道技术, 2019,56(4): 30-37
[6] 李 好.大断面岩溶隧道贯通段地质情况的无线电波透视试验探测[J]. 现代隧道技术, 2019,56(4): 38-42
[7] 岑培山 1 田坤云 2 王喜民 3.蒙华铁路阳山隧道瓦斯危害性评估研究[J]. 现代隧道技术, 2019,56(4): 43-49
[8] 朱建峰 1 宫全美 2.软土地层盾构隧道长期沉降离心试验研究[J]. 现代隧道技术, 2019,56(4): 49-55
[9] 陈柚州 1 任 涛 2 邓 朋 2 王 斌 3.基于人工蜂群优化小波神经网络的隧道沉降预测[J]. 现代隧道技术, 2019,56(4): 56-61
[10] 王登茂 滕振楠 田志宇 陈志学.桃园至巴中高速公路八庙隧道非常规岩爆段病害处治与设计反思[J]. 现代隧道技术, 2019,56(4): 62-68
[11] 吴树元 1 程 勇 1 谢全敏 2 刘继国 1 陈必光 1.西藏米拉山隧道围岩大变形成因分析[J]. 现代隧道技术, 2019,56(4): 69-73
[12] 王 睢 1,2,3 钟祖良 3 刘新荣 3 吴 波 1,2,4 赵勇博 1,2 李占涛 1,2.基于D-P准则有压圆形衬砌隧洞弹塑性解[J]. 现代隧道技术, 2019,56(4): 74-80
[13] 李 明 严松宏 潘春阳 张旭斌.富水大断面黄土隧道开挖流固耦合效应分析[J]. 现代隧道技术, 2019,56(4): 81-88
[14] 张 凯 1 陈寿根 2 霍晓龙 3 谭信荣 4.岩溶地区隧道涌水风险的可拓评价模型及应用[J]. 现代隧道技术, 2019,56(4): 89-96
[15] 李 杰 1 张 斌 1 付 柯 1 马 超 1 郭京波 1 牛得草 2.基于现场掘进数据的复合地层盾构掘进性能预测方法研究[J]. 现代隧道技术, 2019,56(4): 97-104
Copyright 2010 by 现代隧道技术