[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2014, Vol. 51 Issue (4) :178-184    DOI:
规划与设计 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
深穗中跨珠江口通道选用盾构法隧道方案的风险及对策
(1 暨南大学理工学院,广州510632;2广州市地下铁道总公司,广州510335; 3 广州轨道交通建设监理有限公司,广州510010)
Risks and Countermeasures for the Shenzhen-Guangzhou-Zhongshan (SGZ) Shield-Tunnel Project Crossing the Pearl River Estuary
(1 College of Science and Engineering, Jinan University, Guangzhou 510632; 2 Guangzhou Metro Corporation, Guangzhou 510335; 3 Guangzhou Mass Transit Engineering Consultant Co. Ltd., Guangzhou 510010)
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 长大深水底隧道面临着复杂地质、环境保护、港口产业、航道交通、空域交通、异常气象等风险,盾构法隧道作为一种环境友好型工法,具有自身独特的优势去克服以上风险。文章针对深圳、广州至中山跨珠江口通道工程的特点,基于广州地铁在类同复合地层盾构工程的大规模实践成果,同时结合国内外大直径、高水压、长距离推进等盾构施工关键技术的突破和经验,对施工方案进行了综合研究,认为盾构法三隧洞方案”功能齐备、质量保障、经济合理、风险可控等优势明显,为本工程最优方案,并进一步分析了本盾构隧道工程的风险及对策。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
黄威然1
3
竺维彬2
刘人怀1
关键词:   
Abstract: Regarding the risks involved in the construction of a long and deep submarine tunnel, such as complex geology, environmental protection, port industry, waterway transportation, air transportation, and abnormal meteorology, the environmentally friendly shield-driven tunnel construction method option has unique advantages. Based on the construction characteristics of the Shenzhen-Guangzhou-Zhongshan (SGZ) fixed link that crosses the Pearl River estuary, the achievements of the Guangzhou Metro in similar mixed ground, as well as the construction experience gained from international large-diameter, high-hydraulic-pressure and long-distance shield tunnel projects, the following conclusion is derived in this paper: the three-tube tunnel system is the optimal construction scheme because of its suitable functions, guaranteed quality, reasonable costs, and controllable risks. Additionally, a further analysis of the risks and countermeasures is described as a reference for similar projects.
KeywordsFixed-link crossing of the Pearl River estuary,   Mixed ground,   Shield tunnel,   Risks font-family: "Calibri","sans-serif",   mso-bidi-font-size: 11.0pt,   mso-fareast-font-family: 宋体,   mso-bidi-font-family: "Times New Roman",   mso-font-kerning: 1.0pt,   mso-ansi-language: EN-US,   mso-fareast-language: ZH-CN,   and countermeasures')" href="#">mso-bidi-language: AR-SA">and countermeasures     
出版日期: 2014-04-28
作者简介: 作者简介: 黄威然(1977-),男,教授级高级工程师,从事隧道施工管理工作,E-mail:zhuweibin@qzmtr.com.
引用本文:   
黄威然1, 3, 竺维彬2等 .深穗中跨珠江口通道选用盾构法隧道方案的风险及对策[J]  现代隧道技术, 2014,V51(4): 178-184
HUANG Wei-Ran-1, 3 , Zhu-Wei-Bin-2 etc .Risks and Countermeasures for the Shenzhen-Guangzhou-Zhongshan (SGZ) Shield-Tunnel Project Crossing the Pearl River Estuary[J]  MODERN TUNNELLING TECHNOLOGY, 2014,V51(4): 178-184
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2014/V51/I4/178
 
没有本文参考文献
[1] 刘飞香 1,2.SCDZ133智能型隧道多功能作业台车及其施工技术[J]. 现代隧道技术, 2019,56(4): 1-7
[2] 周文波 吴惠明 赵 峻.泥岩地层常压刀盘盾构的掘进策略与分析[J]. 现代隧道技术, 2019,56(4): 8-15
[3] 陈卓立 1,2 朱训国 1,2 赵德深 1,2 王云平 1,2.深埋隧洞让压支护结构的锚固机理探究[J]. 现代隧道技术, 2019,56(4): 16-22
[4] 王全胜.矩形盾构法隧道管片分块案例分析及分块原则[J]. 现代隧道技术, 2019,56(4): 23-29
[5] 张 恒 1 朱亦墨 1 林 放 1 陈寿根 1 杨家松 2.基于Q系统的地下洞库中台阶最佳开挖高度研究[J]. 现代隧道技术, 2019,56(4): 30-37
[6] 李 好.大断面岩溶隧道贯通段地质情况的无线电波透视试验探测[J]. 现代隧道技术, 2019,56(4): 38-42
[7] 岑培山 1 田坤云 2 王喜民 3.蒙华铁路阳山隧道瓦斯危害性评估研究[J]. 现代隧道技术, 2019,56(4): 43-49
[8] 朱建峰 1 宫全美 2.软土地层盾构隧道长期沉降离心试验研究[J]. 现代隧道技术, 2019,56(4): 49-55
[9] 陈柚州 1 任 涛 2 邓 朋 2 王 斌 3.基于人工蜂群优化小波神经网络的隧道沉降预测[J]. 现代隧道技术, 2019,56(4): 56-61
[10] 王登茂 滕振楠 田志宇 陈志学.桃园至巴中高速公路八庙隧道非常规岩爆段病害处治与设计反思[J]. 现代隧道技术, 2019,56(4): 62-68
[11] 吴树元 1 程 勇 1 谢全敏 2 刘继国 1 陈必光 1.西藏米拉山隧道围岩大变形成因分析[J]. 现代隧道技术, 2019,56(4): 69-73
[12] 王 睢 1,2,3 钟祖良 3 刘新荣 3 吴 波 1,2,4 赵勇博 1,2 李占涛 1,2.基于D-P准则有压圆形衬砌隧洞弹塑性解[J]. 现代隧道技术, 2019,56(4): 74-80
[13] 李 明 严松宏 潘春阳 张旭斌.富水大断面黄土隧道开挖流固耦合效应分析[J]. 现代隧道技术, 2019,56(4): 81-88
[14] 张 凯 1 陈寿根 2 霍晓龙 3 谭信荣 4.岩溶地区隧道涌水风险的可拓评价模型及应用[J]. 现代隧道技术, 2019,56(4): 89-96
[15] 李 杰 1 张 斌 1 付 柯 1 马 超 1 郭京波 1 牛得草 2.基于现场掘进数据的复合地层盾构掘进性能预测方法研究[J]. 现代隧道技术, 2019,56(4): 97-104
Copyright 2010 by 现代隧道技术