强风化花岗岩隧道水平旋喷桩预加固效果分析
( 1中铁第一勘察设计院集团有限公司,西安 710043; 2长安大学陕西省公路桥梁与隧道重点实验室,西安710064; 3福州市城乡建设发展总公司,福州 350004; 4 中国有色金属工业西安勘察设计研究院,西安 710054)
On the Effects of Horizontal Jet Grouting Pile Pre-Reinforcement of Tunnels in a Strong Weathered Granite Stratum
(1 China Railway First Survey and Design Institute Group Co. Ltd., Xi′an 710043; 2 Shaanxi Provincial Major Laboratory for Highway Bridge & Tunnel, Changan University, Xi′an 710064; ; 3 Fuzhou Urban Construction and Development Co. Ltd.,Fuzhou 350004;4 Xi′an Engineering Investigation and Design Research Institute of China National Non-Ferrous Metal Industry, Xi′an 710054)
Download: PDF (2754KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要      福州市湖东东路隧道暗挖段穿越砂土状强风化花岗岩地层, 地表沉降控制要求高, 设计采用水平旋喷桩预加固辅助措施。为指导实际施工、 确定施工的监测重点, 文章采用三维弹塑性有限元方法, 对水平旋喷预加固效果及隧道结构体系位移变化规律进行了研究。结果表明, 与无旋喷桩加固工况相比, 采用旋喷桩加固后, 隧道拱顶的最终沉降值减少了 63.45%, 掌子面的最终纵向位移值减少了 69.6%, 掌子面的塑形应变区范围也明显减小。水平旋喷桩预加固措施能够有效地控制变形, 加固效果十分明显。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
关键词:   
Abstract: In Fuzhou, the bored section of the Hudongdonglu tunnel passes through a sandy strong weathered granite stratum and therefore requires strict control of surface deformation. Horizontal jet grouting piles pre-reinforcement technology was adopted in its design. In order to guide construction and identify the key points for tunnel construction monitoring, a study on the pre-reinforcement effect of horizontal jet grouting piles and the law of tunnel structure displacement was performed using the 3D elasto-plastic finite element method. Study results show that with reinforcement with horizontal jet grouting piles, compared to construction with no horizontal jet grouting piles,the final settlement of the arch crown was reduced by 63.45%, the longitudinal displacement of the tunnel face was decreased by 69.6% and the plastic strain area of the tunnel face was reduced dramatically. The pre-reinforcement by horizontal jet grouting piles effectively controls the deformation and has a remarkable reinforcement effect.
KeywordsTunnel,   Strong weathered granite stratum,   Horizontal jet grouting piles,   Numerical simulation,   Dis? placement,   Plastic strain     
基金资助:

基金项目: 陕西省科技厅工业科技攻关项目 (2015GY185) .

作者简介: 作者简介: 汪 珂(1989-), 男, 硕士, 主要从事地铁结构设计及科研工作, E-mail: 372836091@qq.com.
引用本文:   
.强风化花岗岩隧道水平旋喷桩预加固效果分析[J]  现代隧道技术, 2016,V53(5): 168-175
.On the Effects of Horizontal Jet Grouting Pile Pre-Reinforcement of Tunnels in a Strong Weathered Granite Stratum[J]  MODERN TUNNELLING TECHNOLOGY, 2016,V53(5): 168-175
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2016/V53/I5/168
 
没有本文参考文献
[1] 刘飞香 1,2.SCDZ133智能型隧道多功能作业台车及其施工技术[J]. 现代隧道技术, 2019,56(4): 1-7
[2] 周文波 吴惠明 赵 峻.泥岩地层常压刀盘盾构的掘进策略与分析[J]. 现代隧道技术, 2019,56(4): 8-15
[3] 陈卓立 1,2 朱训国 1,2 赵德深 1,2 王云平 1,2.深埋隧洞让压支护结构的锚固机理探究[J]. 现代隧道技术, 2019,56(4): 16-22
[4] 王全胜.矩形盾构法隧道管片分块案例分析及分块原则[J]. 现代隧道技术, 2019,56(4): 23-29
[5] 张 恒 1 朱亦墨 1 林 放 1 陈寿根 1 杨家松 2.基于Q系统的地下洞库中台阶最佳开挖高度研究[J]. 现代隧道技术, 2019,56(4): 30-37
[6] 李 好.大断面岩溶隧道贯通段地质情况的无线电波透视试验探测[J]. 现代隧道技术, 2019,56(4): 38-42
[7] 岑培山 1 田坤云 2 王喜民 3.蒙华铁路阳山隧道瓦斯危害性评估研究[J]. 现代隧道技术, 2019,56(4): 43-49
[8] 朱建峰 1 宫全美 2.软土地层盾构隧道长期沉降离心试验研究[J]. 现代隧道技术, 2019,56(4): 49-55
[9] 陈柚州 1 任 涛 2 邓 朋 2 王 斌 3.基于人工蜂群优化小波神经网络的隧道沉降预测[J]. 现代隧道技术, 2019,56(4): 56-61
[10] 王登茂 滕振楠 田志宇 陈志学.桃园至巴中高速公路八庙隧道非常规岩爆段病害处治与设计反思[J]. 现代隧道技术, 2019,56(4): 62-68
[11] 吴树元 1 程 勇 1 谢全敏 2 刘继国 1 陈必光 1.西藏米拉山隧道围岩大变形成因分析[J]. 现代隧道技术, 2019,56(4): 69-73
[12] 王 睢 1,2,3 钟祖良 3 刘新荣 3 吴 波 1,2,4 赵勇博 1,2 李占涛 1,2.基于D-P准则有压圆形衬砌隧洞弹塑性解[J]. 现代隧道技术, 2019,56(4): 74-80
[13] 李 明 严松宏 潘春阳 张旭斌.富水大断面黄土隧道开挖流固耦合效应分析[J]. 现代隧道技术, 2019,56(4): 81-88
[14] 张 凯 1 陈寿根 2 霍晓龙 3 谭信荣 4.岩溶地区隧道涌水风险的可拓评价模型及应用[J]. 现代隧道技术, 2019,56(4): 89-96
[15] 李 杰 1 张 斌 1 付 柯 1 马 超 1 郭京波 1 牛得草 2.基于现场掘进数据的复合地层盾构掘进性能预测方法研究[J]. 现代隧道技术, 2019,56(4): 97-104