[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2018, Vol. 55 Issue (1) :148-155    DOI:
分析与计算 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
软土盾构隧道施工阶段上浮计算模型探讨
(1 河北交通职业技术学院土木工程系,石家庄 050091;2 石家庄铁道大学土木工程学院,石家庄 050043;3 西南交通大学土木工程学院,成都 610031)
Calculation Model of the Uplift Movement of a Shield Tunnel during Construction in Soft Soil
(1 Department of Civil Engineering, Hebei Jiaotong Vocational and Technical College, Shijiazhuang 050091; 2 School of Civil Engineering, Shijiazhuang Tiedao University, Shijiazhuang 050043; 3 School of Civil Engineering, Southwest Jiaotong University,Chengdu 610031)
Download: PDF (2213KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 文章首先对管片上浮作用机理进行了分析,确定了盾构隧道施工阶段上浮计算模型荷载分布规律和计算方法;其次指出了弹性支撑法和修正惯用法直接运用于盾构隧道上浮阶段设计所存在的问题,即弹性支撑法计算得到管片底部向下位移,与实际上浮阶段管片隆起不符,而修正惯用法又不能考虑拱顶上覆土体反向压缩特性;最后,基于弹性支撑法并利用修正惯用法思想提出了能规避上述两个问题的反转抗力力学模型。结果表明:提出的计算模型与施工阶段管片上浮变形特征吻合度高,施工阶段管片上浮状态下弯矩、轴力和剪力最值较弹性支撑法和修正惯用法获得的结果分别增加 68%、21%和 51%以及 34%、69%和 22%,说明按本文推荐计算模型进行上浮管片设计可避免实际工程配筋不足造成的管片破损、开裂或渗漏。其结论可为盾构隧道设计提供一定理论支撑和参考。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
关键词:   
Abstract: The uplift mechanism of a segment is analyzed, and the load distribution law of a calculation model for segment uplift during shield tunnel construction is determined. There are some problems if the elastic support method and modified routine method are directly applied to the design of a shield tunnel during uplifting: calculations by the elastic support method show that segment bottom moves downward and doesn′t conform to the actual conditions of segment uplift, while the modified routine method doesn′t consider the reverse compress characteristics of the overflying soil mass at the tunnel crown. Based on the elastic support method and thoughts of a modified routine method, a mechanical model of reversal resistance is set up. The results show the proposed calculation model agrees very well with the characteristics of segment uplift during construction. The maximum and minimum values of the bending moment, axial force and shear force under the state of segment uplift during construction increase by 68%,21%, 51%, and 34%, 69%, 22%, respectively, compared with the elastic support method and modified routine method, which shows that segment damage and cracking or leaking caused by inadequate reinforcement can be avoided with the proposed design method for an uplift segment.
KeywordsShield,   Tunnel in soft soil,   Segment uplift,   Mechanical model of reversal resistance,   Elastic support method,   Modified routine method     
基金资助:

基金项目:国家自然科学基金(51478277);河北省自然科学基金(E201619002);河北省人才工程培养经费资助科研项目(A201500116);河北省高等学校科学技术研究青年基金(QN2016240).

作者简介: 作者简介:王道远(1982-),男,博士研究生,副教授,主要从事隧道及地下工程教学和研究工作,E-mail:wtg-888@163.com. 通讯作者:袁金秀(1980-),女,硕士,副教授,主要从事隧道及地下工程教学和研究工作,E-mail:xiugirl2007@163.com.
引用本文:   
.软土盾构隧道施工阶段上浮计算模型探讨[J]  现代隧道技术, 2018,V55(1): 148-155
.Calculation Model of the Uplift Movement of a Shield Tunnel during Construction in Soft Soil[J]  MODERN TUNNELLING TECHNOLOGY, 2018,V55(1): 148-155
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2018/V55/I1/148
 
没有本文参考文献
[1] 刘飞香 1,2.SCDZ133智能型隧道多功能作业台车及其施工技术[J]. 现代隧道技术, 2019,56(4): 1-7
[2] 周文波 吴惠明 赵 峻.泥岩地层常压刀盘盾构的掘进策略与分析[J]. 现代隧道技术, 2019,56(4): 8-15
[3] 陈卓立 1,2 朱训国 1,2 赵德深 1,2 王云平 1,2.深埋隧洞让压支护结构的锚固机理探究[J]. 现代隧道技术, 2019,56(4): 16-22
[4] 王全胜.矩形盾构法隧道管片分块案例分析及分块原则[J]. 现代隧道技术, 2019,56(4): 23-29
[5] 张 恒 1 朱亦墨 1 林 放 1 陈寿根 1 杨家松 2.基于Q系统的地下洞库中台阶最佳开挖高度研究[J]. 现代隧道技术, 2019,56(4): 30-37
[6] 李 好.大断面岩溶隧道贯通段地质情况的无线电波透视试验探测[J]. 现代隧道技术, 2019,56(4): 38-42
[7] 岑培山 1 田坤云 2 王喜民 3.蒙华铁路阳山隧道瓦斯危害性评估研究[J]. 现代隧道技术, 2019,56(4): 43-49
[8] 朱建峰 1 宫全美 2.软土地层盾构隧道长期沉降离心试验研究[J]. 现代隧道技术, 2019,56(4): 49-55
[9] 陈柚州 1 任 涛 2 邓 朋 2 王 斌 3.基于人工蜂群优化小波神经网络的隧道沉降预测[J]. 现代隧道技术, 2019,56(4): 56-61
[10] 王登茂 滕振楠 田志宇 陈志学.桃园至巴中高速公路八庙隧道非常规岩爆段病害处治与设计反思[J]. 现代隧道技术, 2019,56(4): 62-68
[11] 吴树元 1 程 勇 1 谢全敏 2 刘继国 1 陈必光 1.西藏米拉山隧道围岩大变形成因分析[J]. 现代隧道技术, 2019,56(4): 69-73
[12] 王 睢 1,2,3 钟祖良 3 刘新荣 3 吴 波 1,2,4 赵勇博 1,2 李占涛 1,2.基于D-P准则有压圆形衬砌隧洞弹塑性解[J]. 现代隧道技术, 2019,56(4): 74-80
[13] 李 明 严松宏 潘春阳 张旭斌.富水大断面黄土隧道开挖流固耦合效应分析[J]. 现代隧道技术, 2019,56(4): 81-88
[14] 张 凯 1 陈寿根 2 霍晓龙 3 谭信荣 4.岩溶地区隧道涌水风险的可拓评价模型及应用[J]. 现代隧道技术, 2019,56(4): 89-96
[15] 李 杰 1 张 斌 1 付 柯 1 马 超 1 郭京波 1 牛得草 2.基于现场掘进数据的复合地层盾构掘进性能预测方法研究[J]. 现代隧道技术, 2019,56(4): 97-104
Copyright 2010 by 现代隧道技术